FIELD: construction.
SUBSTANCE: prior to cutting tool approaching to high-density sections, density of covering and base materials is preliminary defined. Then density is analyzed and tool is selected for damaging and working speed defining for the proper section. According to the invention machine is assumed in case inclusion into road dressing is impossible to damage.
EFFECT: increased life time of road construction machine, operating unit and cutting tools; increased productivity.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PATCHING ASPHALT CONCRETE PAVEMENTS AND DEVICES FOR ITS IMPLEMENTATION | 2022 |
|
RU2794576C1 |
METHOD OF COLD RECOVERY AND STRENGTHENING OF ROAD PAVING MATERIALS | 2011 |
|
RU2471914C2 |
METHOD OF ROAD CONSTRUCTION BROADENING | 2016 |
|
RU2632834C2 |
METHOD FOR CONSTRUCTION OF ROAD PAVEMENT AND CONSTRUCTION OF ROAD PAVEMENT | 2018 |
|
RU2714547C1 |
ROAD COVERING REPAIR METHOD AND ROAD REPAIR UNIT | 2017 |
|
RU2674483C1 |
METHOD OF PATCHING ROAD PAVEMENT | 2018 |
|
RU2740138C2 |
METHOD FOR RECOVERY OF LAYERS OF ROAD PAVEMENT | 2015 |
|
RU2593399C1 |
OPERATING PART OF MACHINE FOR REPAIRING ROAD PAVEMENTS | 0 |
|
SU1728327A1 |
METHOD FOR THERMAL REGENERATION OF ASPHALT CONCRETE (FOUR VERSIONS) | 2011 |
|
RU2482085C2 |
STRENGTHENING METHOD OF ROAD PAVEMENT | 2008 |
|
RU2365698C1 |
Authors
Dates
2008-12-20—Published
2007-04-10—Filed