FIELD: construction.
SUBSTANCE: invention concerns constructional engineering, in particular to built in facilities for aquatic birds - penguinariums. The penguinarium includes a tank for aquatic, coastal and air habitats of aquatic birds. The penguinarium includes visitors' areas. The penguinarium is mostly or completely incorporated in a building. The building comprises vertical and/or inclined and horizontal structures. The tank shell has a head and walls, including a partially translucent wall with stiffness and bearing capacity stepwisely varying throughout the height. The walls form cubic configuration of the tank shell and are partially structurally combined with the building structures. The tank shell walls, building floor or foundation are tightly joined with the tank head and form a water-filled bath. At least one tank shell wall has at least one curvilinear or broken area.
EFFECT: reduced materials consumption and working hours and increased space stiffness of the structure.
12 cl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
CONSTRUCTION OBJECT-MAIN TANK OF OCEANARIUM | 2007 |
|
RU2343258C2 |
MULTI-PURPOSE CONSTRUCTION FACILITY INCLUDING SEAQUARIUM AND GROUP OF SHOPPING AND ENTERTAINMENT FACILITIES | 2007 |
|
RU2347050C2 |
OPERATIONAL METHOD OF BUILDING INCLUDING ENTERTAINMENT-SHOPPING MALL AND OCEANARIUM (VERSIONS) | 2007 |
|
RU2343257C2 |
SEAQUARIUM OPERATION TECHNIQUE | 2007 |
|
RU2344595C2 |
CONSTRUCTION-BIOLOGICAL COMPLEX | 2007 |
|
RU2343261C2 |
SEAQUARIUM STRUCTURAL SYSTEM | 2007 |
|
RU2347051C2 |
MULTI-PURPOSE BUILDING | 2007 |
|
RU2345200C2 |
LIFE SUPPORT SYSTEM OF MAIN OCEANARIUM TANK | 2007 |
|
RU2342832C2 |
LIFE SUPPORT SYSTEM OF GROUP OF SEAQUARIUM TANKS (VERSIONS) | 2007 |
|
RU2343703C2 |
METHOD FOR PURIFYING WATER FROM EXCESS OF PHOSPHATES IN AQUARIUM OF OCEANARIUM FOR KEEPING MARINE HYDROBIONTS | 2022 |
|
RU2802194C2 |
Authors
Dates
2009-02-20—Published
2007-03-01—Filed