FIELD: mining.
SUBSTANCE: methods for extraction of hydrocarbon fluids from well surrounded with rock provide for cementing production string at assembly site with successive production string and tail piece cleaning from excesses of cement solution; then said methods provide for extraction of hydrocarbon fluids using equipment of gas-lift operation.
EFFECT: possibility of completed well cementing in one production string running with following efficient implementation of gas-lift technology for hydrocarbon extraction.
27 cl, 15 dwg
Title | Year | Author | Number |
---|---|---|---|
MANDREL WITH SIDE POCKET THAT MAINTAINS OPERATION CAPABILITY AFTER SUBJECTED TO FLUSH OF CEMENT SLURRY | 2003 |
|
RU2336409C2 |
METHOD FOR CEMENTING SHANK IN WELL AND DEVICE THEREFOR | 2015 |
|
RU2595122C1 |
METHOD FOR FIXING A LINER IN A WELL WITH SUBSEQUENT HYDRAULIC FRACTURING AND A DEVICE FOR ITS IMPLEMENTATION | 2021 |
|
RU2773092C1 |
METHOD FOR INSTALLING A ROTATING LINER IN A WELL AND A DEVICE FOR ITS IMPLEMENTATION | 2021 |
|
RU2777240C1 |
LINER HANGER | 2022 |
|
RU2791318C1 |
0 |
|
SU309121A1 | |
SET OF EQUIPMENT FOR MULTI-STAGE HYDRAULIC FRACTURING | 2022 |
|
RU2777032C1 |
METHOD OF COMPLETING AUXILIARY WELLBORE SHAFT CONSTRUCTION AND RIG TO THIS END | 2009 |
|
RU2391491C1 |
ASSEMBLY AND METHOD FOR FLOW INTENSIFICATION BY HYDRAULIC FRACTURING IN SEVERAL ZONES USING INDEPENDENT UNITS IN PIPE SYSTEMS | 2011 |
|
RU2571460C2 |
METHOD FOR CEMENTING A LINER IN A WELL AND A DEVICE FOR ITS IMPLEMENTATION | 2021 |
|
RU2773116C1 |
Authors
Dates
2009-03-20—Published
2003-10-01—Filed