FIELD: metallurgy.
SUBSTANCE: method includes installation in die holder of centering ring, feeding into container of metallic technological washer and blank with axial bore, pipe pressing into spacing between pressure pad and container wall till bottom formation in technological washer and bottom section. Between centering ring and technological washer is additionally located glass-washer. Volumes of technological washer and c glass-washer are calculated according to specified formulas.
EFFECT: ensured by separation and heat insulation of metallic technological washer from centreing ring and exclusion of flowing of technological washer material into opening of centreing ring it is reduced compacting force at the stage of material pressing-out of technological washer.
1 ex, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXTRUDING SHORT-LENGTH TUBES | 2001 |
|
RU2208490C2 |
METHOD FOR EXTRUDING LARGE-DIAMETER TUBES | 1998 |
|
RU2146177C1 |
DEVICE FOR COMPACTION OF HOLLOW PROFILES | 2010 |
|
RU2443485C2 |
METHOD OF MANUFACTURING SEAMLESS TUBES FROM CYLINDRICAL BILLETS OF HARD-TO-DEFORM METALS AND ALLOYS | 2016 |
|
RU2650474C2 |
HOLLOW CHANNEL PRESSING METHOD, AND DEVICE FOR ITS IMPLEMENTATION | 2013 |
|
RU2535831C1 |
METHOD FOR MANUFACTURE OF STEEL WELDLESS PIPES OF LARGE DIAMETER AND HORIZONTAL HYDRAULIC PRESS FOR ITS REALISATION | 2007 |
|
RU2343031C1 |
APPARATUS FOR BACKWARD EXTRUSION OF THICK-WALL TUBES | 2002 |
|
RU2252093C2 |
DEVICE FOR PRESSING PRECISION PIPES AND METHOD OF PRESSING PRECISION PIPES USING SAME | 2015 |
|
RU2608110C1 |
METHOD FOR MAKING SEAMLESS STEEL TUBES | 1999 |
|
RU2166394C1 |
PROCESS FOR MAKING TUBES BY HOT EXTRUSION | 2004 |
|
RU2262403C1 |
Authors
Dates
2009-03-27—Published
2007-07-25—Filed