FIELD: mining.
SUBSTANCE: invention can be implemented for activation or recovery of operation of oil and gas wells by means of thermal-chemical treatment and cleaning borehole environment from asphalt-resinous and paraffin sediments of various kinds. The method of processing bottomhole zone of well consists in lowering flow string - FS through a casing pipe into a treated interval of well; notably, uncontrolled valve-plug - UVP is secured on pins on the lower end of FS; further, as far as lowering of catalyst goes, the method consists in filling hydrogen peroxide and acetate buffers divided one from another with UVP, in creating back pressure by means of filling a gap between flow string and casing pipe with water; and in building pressure in FS; after jump of pressure conditioning of process is performed and back pressure is relieved; via FS water is pumped into the treated interval of the well; as catalyst; 5% water solution of copper sulphate and suspension of ferroplatinum in benzene or kerosene, or 5% water solution of manganese and suspension of cuproplatinum in benzene or kerosene are filled into FS one after another - the said solution of copper sulphate first, then the said suspension of ferroplatinum, or the said solution of manganese, then the said suspension of cuproplatinum; hydrogen peroxide is stabilised with common soap or starch; after hydrogen peroxide, but before water filling there is performed filling of additional reagent - 5% water solution of hydroquinone, with separation of the said hydrogen peroxide from the said suspension and hydroquinone solution by means of UCP and acetate buffers.
EFFECT: increased efficiency of bottomhole zone processing and utilisation of released energy, also reduced costs for well bottomhole zone processing.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
OIL DEPOSIT DEVELOPMENT METHOD | 2007 |
|
RU2388907C2 |
WELL BOTTOM ZONE TREATMENT METHOD | 2005 |
|
RU2279538C1 |
OIL FIELD DEVELOPMENT METHOD | 2005 |
|
RU2283949C1 |
METHOD OF EXTRACTION OF HIGH VISCOSITY OIL FROM CARBONATE COLLECTORS | 2007 |
|
RU2349743C1 |
OIL FIELD DEVELOPMENT METHOD | 2004 |
|
RU2276256C1 |
METHOD AND DEVICE FOR WELL BORE CASING | 2005 |
|
RU2286439C1 |
METHOD FOR INTENSIFYING OIL PRODUCTION FROM A DENSE AND LOW-PERMEABLE RESERVOIR | 2022 |
|
RU2782666C1 |
METHOD FOR TREATMENT OF BOTTOM-HOLE FORMATION ZONE | 1986 |
|
SU1378454A1 |
OIL FIELD DEVELOPMENT | 2005 |
|
RU2278250C1 |
METHOD FOR INCREASING HYDROPHILICITY OF CARBONATE RESERVOIRS | 2023 |
|
RU2805696C1 |
Authors
Dates
2009-06-10—Published
2007-12-03—Filed