FIELD: construction.
SUBSTANCE: drilling machine contains a mast, a drilling gear, set on slides arranged moving along the mast, drill pipe, driven into rotation by drilling gear and moving along the mast for driving through the drill-hole, and fixed to the drill-pipe through a connective branch tubular bin with accumulative space for filler used for filling up of drill-hole when pulling out the drill-pipe. Tubular bin is arranged under the drilling gear, and connective branch goes through the latter. A swivel connected with a bin is installed on the connective branch above the drilling gear, and between the drilling gear and tubular bin there is a support stand going in the drilling direction and holding the swivel. Method of building-up of cast-in-place displacement pile is conducted by means of a drilling machine described above.
EFFECT: possibility of drill-pipe direct approaching drilling gear without necessity of placing intermediate elements for accumulation of the filler in between.
8 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
BORING MACHINE AND METHOD OF FITTING IN-SITU PILE IN SOIL | 2007 |
|
RU2352721C2 |
SOIL DRILLING DEVICE AND ITS OPERATING METHOD | 2008 |
|
RU2393318C2 |
METHOD AND SYSTEM FOR DRILLED WELL DEVELOPMENT AND MEASUREMENT | 2013 |
|
RU2570688C2 |
DRILLING RIG AND METHOD FOR DRILLING TOOL FEEDING IN GROUND | 2004 |
|
RU2282703C2 |
CONSTRUCTION MACHINE AND CONTROL METHOD OF CONSTRUCTION MACHINE | 2013 |
|
RU2536595C2 |
BORING TOOL FOR HOLE MAKING FOR FOUNDATION PILES AND BORING UNIT | 2005 |
|
RU2327024C2 |
DRILLING DEVICE AND DRILLING METHOD | 2002 |
|
RU2240418C2 |
DEVICE FOR WELL DEVELOPMENT IN GROUND | 2014 |
|
RU2576063C2 |
METHOD AND DEVICE FOR DRILLING OF AUXILIARY BORE PITS | 2009 |
|
RU2484230C2 |
DRILLING MACHINE | 2012 |
|
RU2521264C2 |
Authors
Dates
2009-06-27—Published
2007-04-19—Filed