FIELD: construction.
SUBSTANCE: manner of installation of the capacity from prefabricated elements presupposes building of a circular footing of precast units with embedded circular plate, assembling of shield-like elements, manufacture and installation of support elements, fastening all the elements. Capacity is assembled by consecutive installation of short and long support elements, made as plate sheet roll-formed angles, width whereof equals two widths of the wall of shield-like elements, bent along the perimetre of the cross section of the shield-like elements. Short support elements adjoin shield-like elements on the inner side of the latter; and long ones on the outer side, whereat support angle-shaped elements with one shelf are fastened to shield-like elements, and with the other shelf to embedded parts of footing.
EFFECT: simplified assembling of the capacity of precast elements and improved efficiency of works.
1 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
BUILDING PANELS, FOUNDATION STRUCTURE, THREE-DIMENSIONAL BUILDING STRUCTURE, METHODS FOR THREE-DIMENSIONAL BUILDING STRUCTURE ERECTION AND BUILDING HEAT INSULATION | 2004 |
|
RU2277619C2 |
METHOD TO ASSEMBLE RIBBED DOME | 2011 |
|
RU2474654C1 |
COMPOSITE METAL VESSELS ASSEMBLAGE METHOD | 2005 |
|
RU2299961C1 |
COMPOSITE BEARING BLOCK AND FIELD CONNECTION OF BEARING BLOCKS OF PREFABRICATED BUILDING STRUCTURE | 2012 |
|
RU2519021C2 |
PREFABRICATED BLOCK-MODULAR BUILDING (OPTIONS) | 2023 |
|
RU2811578C1 |
FRAMEWORK UNIVERSAL PREFABRICATED ARCHITECTURAL AND CONSTRUCTION SYSTEM | 2016 |
|
RU2634139C1 |
LIQUID STORAGE TANK | 0 |
|
SU896228A1 |
STEEL-FERROCONCRETE BRIDGE SPAN STRUCTURE | 0 |
|
SU939625A1 |
FIELD COLLAPSIBLE FORTIFICATION STRUCTURE | 2013 |
|
RU2526076C1 |
CONNECTION OF REINFORCED CONCRETE WALL PANELS | 2024 |
|
RU2824929C1 |
Authors
Dates
2009-06-27—Published
2007-12-17—Filed