FIELD: oil and gas production.
SUBSTANCE: invention refers to oil industry and can be implemented at construction of well. The disclosed method of well construction consists in destruction of rock, in direct flushing with drill agent via a drill string, and in removal of drilled rock to day surface into an absorbing zone. During removal of drilled rock into the absorbing zone flushing is carried out with foam produced by foaming of 1.5-2.5 % solution of surface active substances ML-81B in water to the degree of aeration of 5-10%.
EFFECT: maintaining collecting properties of producing reservoir.
3 ex
Title | Year | Author | Number |
---|---|---|---|
TECHNIQUE TO DRIVE HOLES IN HIGHLY PENETRABLE CRUMBLING GAS- SATURATED COLLECTORS | 2001 |
|
RU2184206C1 |
SLIM HOLE WELL CONSTRUCTION METHOD | 2009 |
|
RU2393320C1 |
CONSTRUCTION METHOD FOR SLIM-HOLE WELL | 2012 |
|
RU2490429C1 |
WELL CONSTRUCTION METHOD | 2012 |
|
RU2474668C1 |
WELL CONSTRUCTION METHOD | 2011 |
|
RU2451149C1 |
METHOD FOR WELL DRILLING | 2012 |
|
RU2478769C1 |
METHOD FOR WELL CEMENTATION | 2002 |
|
RU2232258C2 |
WELL CONSTRUCTION METHOD | 2008 |
|
RU2375551C1 |
CONSTRUCTION METHOD OF WELL OF SMALL DIAMETRE | 2010 |
|
RU2407879C1 |
METHOD FOR PRIMARY PRODUCTIVE BED PENETRATION FOR OIL AND GAS DRILLING | 2003 |
|
RU2283418C2 |
Authors
Dates
2009-09-10—Published
2008-10-27—Filed