FIELD: oil and gas production, particularly for flushing boreholes, for instance by use of exhaust air from motor.
SUBSTANCE: method involves performing mechanical well drilling with the use of aqueous fresh drilling mud to which additives are sequentially admixed. Active bentonite phase is added during mechanical drilling before productive bed penetration. Nitrilotrimethylphosphonic acid N(CH2PO3H2)3 is mixed with drilling mud after productive bed penetration and mechanical well extension operation termination. Synthetic polymeric agent, namely polyethylenoxide, is added to drilling mud after well bore reaming within productive rock interval. Then at least one well bore section is filled with chalk solution without plastering reagents.
EFFECT: provision of optimal productive bed penetration conditions.
1 ex
Title | Year | Author | Number |
---|---|---|---|
WELL COMPLETION METHOD | 2004 |
|
RU2280752C2 |
CONSTRUCTION OF OIL PRODUCTION WELL | 2013 |
|
RU2524089C1 |
HYDRO-JET-MECHANICAL PROCEDURE FOR DECREASING PERMEABILITY OF WELL WALLS | 2010 |
|
RU2428560C1 |
CONSTRUCTION METHOD OF DEEP WELL, PLUGGING SOLUTION FOR ITS IMPLEMENTATION AND STRUCTURE OF DEEP WELL | 2008 |
|
RU2386787C9 |
METHOD FOR WELL CONSTRUCTION | 2012 |
|
RU2494214C1 |
METHOD OF WELL CONSTRUCTION IN COMPLICATED MINING AND GEOLOGICAL CONDITIONS FOR DRILLING AND DEVICE FOR ITS IMPLEMENTATION | 2013 |
|
RU2531409C1 |
METHOD OF WELL DRILLING | 2016 |
|
RU2606998C1 |
METHOD FOR COMPLETION OF WELL | 0 |
|
SU1838589A3 |
METHOD OF DRILLING HORIZONTAL WELLS WITH PILOT SHAFT | 2015 |
|
RU2587660C1 |
METHOD FOR WELL CONSTRUCTION | 1989 |
|
RU2021477C1 |
Authors
Dates
2006-09-10—Published
2003-04-11—Filed