FIELD: explosion operations.
SUBSTANCE: invention concerns mining and railway construction, particularly drilling and blasting driving of horizontal and slightly sloping mines and railway tunnels. Method of cut-hole formation involves drilling of advance slightly sloping well and filling it with water. Further the cut-holes, relievers and cropper holes are drilled. Explosive charges are loaded into blast holes and well. Pinpoint blasting charge weight in the well is calculated by the well diametre, cut-hole length, physical and operational properties of cut-hole rock, overburden pressure and explosive detonation speed. Explosion of pin-point blasting charge in water generates hydroshock wave reducing shock hazard in a bump-hazardous rock bed in the zone of new face.
EFFECT: high-quality cut-hole, increased ratio of advance per blast hole during pit and tunnel driving.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CUT-HOLE FORMATION | 2007 |
|
RU2366891C1 |
DRILLING-AND-BLASTING METHOD OF MINE WORKINGS IN STRESSED FRACTURED ROCK MASSES | 2011 |
|
RU2502045C2 |
METHOD FOR OBTAINING A PRESET CRUSHING RATIO OF FISSURED MOUNTAIN MASS AND THE REQUIRED COEFFICIENT OF HEADING ADVANCE PER ROUND TO SHOT HOLES LENGTH RATIO | 2010 |
|
RU2442957C2 |
METHOD FOR PRODUCTION OF CUTTING CAVITY | 2008 |
|
RU2379623C1 |
PROCESS OF DESTRUCTION OF ROCKS WITH DRIVING OF WORKING IN THEM | 1992 |
|
RU2006581C1 |
METHOD FOR SEAM DAMAGE OF CRACKED ROCKS | 2011 |
|
RU2485438C1 |
METHOD FOR FORMING FISSURE CAVITY OF ANY CONFIGURATION IN ROCK MASS WITH USE OF PARALLELY CONVERGED SHEAR AND BLAST-HOLE CHARGES | 2017 |
|
RU2659446C1 |
METHOD AT MINE WORKING THROUGH BURST-DANGEROUS SEAMS AND ROCKS | 0 |
|
SU1765462A1 |
METHOD FOR DETERMINING THE STRESS STATE OF ROCK FORMATIONS | 2021 |
|
RU2768768C1 |
METHOD OF FORMATION OF CUTTING CAVITY | 1992 |
|
RU2081392C1 |
Authors
Dates
2009-09-10—Published
2007-12-24—Filed