FIELD: oil-and-gas production.
SUBSTANCE: invention related to oil-and-gas production, particularly to heterogeneous stratum filtration characteristics change, reservoir recovery increase and decrease in production wells water content with receiving maximal effect at the late stage of oil field development. Method of injection wells input profile alignment and production wells water flow limitation includes pumping working agent into stratum-fresh or mineralized water and insulating media, which consists of wt %: polymer POLYCELL AQUABLOCK 140 0.05-0.08, bonding agent chrome acetate 0.005-0.008, the rest is water, executing 1-4 days process delay, at that insulating media made as a suspension, prepared in a such way that polymer POLYCELL AQUABLOCK 140 and water solution of chrome acetate dispensed into water simultaneously, mixed during 15 minutes and pumped into the well. Invention develops in formula subclaime.
EFFECT: increase of gelling composition insulation parametres and in quality of injection wells input profile adjustment, because of better strength characteristic of media which keeps gel bonding structure and at the same time allows to adjust time of gelling, device arsenal diversification.
3 cl, 2 tbl, 6 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF EQUALIZATION OF INJECTIVITY PROFILE IN INJECTION WELLS AND RESTRICTION OF WATER INFLOWS TO PRODUCING WELLS | 2000 |
|
RU2169258C1 |
JUSTIFICATION METHOD OF INPUT PROFILE IN INJECTION WELL | 2015 |
|
RU2610961C1 |
METHOD OF LEVELING INJECTIVITY PROFILE OF INJECTION WELLS AND LIMITING WATER INFLOW TO PRODUCTION WELLS | 2016 |
|
RU2661973C2 |
METHOD OF CONTROLLING PROFILE LOG OF INJECTION WELL AND RESTRICTING WATER INFLUX IN PRODUCTION WELL | 2007 |
|
RU2347897C1 |
METHOD FOR INJECTION WELL INFECTIVITY PROFILE ALIGNING AND WATER IN-FLOW LIMITATION FOR PRODUCTION WELL (VERSIONS) | 2009 |
|
RU2382185C1 |
METHOD FOR CONTROL OF FLOODING AREA OF OIL FORMATIONS | 2010 |
|
RU2451168C1 |
CONTROL METHOD OF WATER FLOODING OF NON-HOMOGENEOUS RESERVOIR BEDS OF DEPOSITS OF MINEFIELDS BY MEANS OF CROSS-LINKED POLYMER SYSTEMS WITH FILLER | 2009 |
|
RU2422628C1 |
METHOD FOR LIMITATION OF WATER INFLOW TO WELLS AT THICK OIL DEPOSITS | 2016 |
|
RU2632799C1 |
INJECTIVITY PROFILE CONTROL METHOD FOR INJECTION WELL AND WATER INFLUX RESTRICTION METHOD FOR PRODUCING WELL | 2005 |
|
RU2285785C1 |
METHOD FOR BALANCING INJECTION WELL WATER-INTAKE CAPACITY PROFILE AND RESTRICTION OF WATER INFLUX TO PRODUCTION WELLS | 2011 |
|
RU2456439C1 |
Authors
Dates
2009-12-10—Published
2008-07-18—Filed