WELL PUMPED-STORAGE INSTALLATION Russian patent published in 2009 - IPC F03B13/06 F03B13/10 

Abstract RU 2377436 C1

FIELD: engines and pumps.

SUBSTANCE: invention relates to energetics, particularly to devices for receiving of electricity excluding burning of fuel for it and is a renewable energy source. Operation of power plant includes two processes: energy generation (EG) and water lifting (WL), do not matching in time, herewith WL is implemented ensured by electric power generated by wind-driven powerplant 19 (WDP). EG is implemented by hydraulic unit including hydraulic machine 5 in the form of hydroturbine, connected to electric machine 6 in the form of electric generator, installed in drill hole, in which operates hydropower water flow (HWF), hydraulic power of which transforms by hydraulic unit into electric energy and passed to original ground. HWF is formed by water flow from located higher water source 2, communicated to drilling well 1, and area of water withdrawal is communicated to it drainage area, located lower the water source. Drainage area can be underground collector, cavitated formation, absorption area 16, 17 or 18 and others, its volume is limited. Hydroturbine, electric generator and current communications channel 9 of downhole hydraulic unit with electrical switching transforming panel 11 at original ground are adapted for operation in downhole conditions. WL provides three versions of water lifting from absorbing area: borehole hydraulic unit is reversible hydraulic machine herewith hydraulic machine is implemented in the form of centrifugal pump, and electric machine in the form of electric motor, and for lifting of water it is used the sane drill well 1, for water lifting it is used special production well 24, by which it is over-drilled absorbing area and in which it is installed water-lifting pipe string 26 with perforated section 27 with submersible pump at its bottom end, for water lifting there are used pumping wells 34 and 35, drilled up to absorbing areas 17 and 18 and water-lifting wells 53 and 54, by which there are over-drilled absorbing areas 17 and 18.

EFFECT: creation of nuclear power plant, allowing wide range of application conditions.

3 cl, 6 dwg

Similar patents RU2377436C1

Title Year Author Number
HYDRAULIC GEOPOWER STATION (VERSIONS) 2008
  • Eliseev Aleksandr Dmitrievich
RU2376495C1
DOWNHOLE HYDROELECTRIC STATION 2007
  • Eliseev Aleksandr Dmitrievich
RU2373431C2
HYDRAULIC UNIT OF BOREHOLE HYDRAULIC POWER PLANT 2006
  • Eliseev Aleksandr Dmitrievich
RU2329395C2
DOWNHOLE HYDRAULIC ELECTRIC POWER STATION HYDRAULIC UNIT 2008
  • Eliseev Aleksandr Dmitrievich
RU2376491C1
METHOD OF PUMPED STORAGE 2006
  • Eliseev Aleksandr Dmitrievich
RU2341618C2
DIVERSION WELL HYDRAULIC POWER PLANT 2010
  • Eliseev Aleksandr Dmitrievich
  • Neskoromnykh Vjacheslav Vasil'Evich
  • Pavljukova Elena Nikolaevna
RU2431015C1
BOREHOLE HEAT SUPPLY SYSTEM WITH UNDERGROUND HEAT-HYDRO-ACCUMULATION 2008
  • Eliseev Aleksandr Dmitrievich
RU2371638C1
PROCEDURE OF FORMATION OF HYDRO-POWER FLOW IN DRILL WELL 2008
  • Eliseev Aleksandr Dmitrievich
RU2370592C1
METHOD OF HYDROPOWER FLUX FORMATION INSIDE WELL 2006
  • Eliseev Aleksandr Dmitrievich
RU2329355C2
BOREHOLE HYDRO-STREAM POWER METER 2007
  • Eliseev Aleksandr Dmitrievich
RU2348804C2

RU 2 377 436 C1

Authors

Eliseev Aleksandr Dmitrievich

Dates

2009-12-27Published

2008-03-27Filed