FIELD: oil and gas production.
SUBSTANCE: method involves subsequent pumping of acid solution and deposit-forming compound to the bed. After deposit-forming compound is pumped to the bed, there subsequently pumped is gel-forming compound and cement grout bank. As acid solution, there used is hydrolysis acid, as deposit-forming compound there used is composition on the basis of sodium bisulphate, which contains, wt %: sodium bisulphate 3-20; 5-20% solution of techincal lignosulphonate in water with mineralisation of up to 18 g/l 3-20; organic-silicon water-repellent agent is the rest, as gel-forming compound it contains polyacrylamide, sodium bichromate and technical lignosulphonate at the following component ratio, vol %: polyacrylamide - 0.5-1.0; sodium bichromate - 0.1-0.2; techincal lignosulphonate - 0.2-0.4; water - the rest. Cement grout can be modified with anionic surface-active substances plasticising agent addition with volume of 10-20%.
EFFECT: increasing water influx insulation efficiency in beds which are non-homogenous as to permeability.
2 cl, 3 tbl, 2 ex
Title | Year | Author | Number |
---|---|---|---|
COMPOSITION FOR TREATMENT OF BOTTOM HOLE ZONE OF COLLECTORS WITH LOW PERMEABILITY | 2007 |
|
RU2342419C1 |
COMPOSITION FOR FORMATION WATER SHUTOFF | 2002 |
|
RU2213214C1 |
METHOD OF COMPLEX ACTION ON FACE ZONE OF WELL | 2001 |
|
RU2184221C1 |
METHOD FOR SELECTIVE ISOLATION OF WATER INFLOW | 1992 |
|
RU2046185C1 |
PROCEDURE FOR DEVELOPMENT OF NON-UNIFORM RESERVOIR | 2008 |
|
RU2401939C2 |
PROCEDURE FOR DEVELOPMENT OF NON-UNIFORM OIL RESERVOIR | 2009 |
|
RU2394155C1 |
COMPLEX TECHNOLOGY OF CLEANING OF BOTTOM-HOLE ZONE | 2000 |
|
RU2158356C1 |
BOTTOM-HOLE TREATMENT COMPOSITION | 2007 |
|
RU2368640C1 |
METHOD OF INSULATING WASHED HIGH-PERMEABILITY ZONES OF PRODUCTIVE FORMATION | 1998 |
|
RU2136870C1 |
METHOD OF OIL MINING DEVELOPMENT | 0 |
|
SU1836550A3 |
Authors
Dates
2010-01-10—Published
2008-07-16—Filed