FIELD: oil and gas producing industry. SUBSTANCE: complex technology includes lowering into well of pipes, injection of reagents into interval of treatment and their holding for reaction, cleaning of formation and lifting of pipes. Cleaning of bottom-hole zone is carried out in several stages during one round-trip operation. At the first stage, injected into well is 10% aqueous solution of sodium carbonate with additions of sodium silicate in amount of 2% of sodium carbonate volume in terms of 0.8 cu.m per running meter of formation effective thickness. Then, formation is cleaned. At the second stage, injected into well is 10% aqueous solution of sodium bisulfate in terms of 0.5 cu.m per running meter of formation effective thickness. At the third stage, pipes are lifted after several cleanings of formation, attaining preset inflow and determination of pressure recovery curve. EFFECT: higher efficiency of cleaning of bottom-hole. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR CLEANING BOTTOM-HOLE ZONE OF WELLS | 1999 |
|
RU2141558C1 |
METHOD OF COMPLEX ACTION ON FACE ZONE OF WELL | 2001 |
|
RU2184221C1 |
METHOD OF TREATING OIL WELL BOTTOM ZONE | 1995 |
|
RU2097528C1 |
COMPOSITION FOR TREATMENT OF BOTTOM HOLE ZONE OF COLLECTORS WITH LOW PERMEABILITY | 2007 |
|
RU2342419C1 |
METHOD OF PROCESS WELL TREATMENT | 2015 |
|
RU2600137C1 |
METHOD OF TREATMENT OF BOTTOMHOLE ZONE OF THE WELL | 2019 |
|
RU2708647C1 |
TREATMENT METHOD OF LAYER BOTTOMHOLE | 2007 |
|
RU2359113C1 |
BOTTOM-HOLE TREATMENT COMPOSITION | 2007 |
|
RU2368640C1 |
WELL DEVELOPMENT METHOD AFTER TREATMENT OF BOTTOMHOLE FORMATION ZONE | 2018 |
|
RU2698354C1 |
SELECTIVE WATER INFLUX INSULATION METHOD | 2008 |
|
RU2378491C1 |
Authors
Dates
2000-10-27—Published
2000-01-21—Filed