FIELD: oil-and-gas industry.
SUBSTANCE: method of efficiency recovery and stand by wells, with collector of complicated design in abnormally low formation pressure conditions and production string bottom part collapse includes execution of repair-isolation works and reservoir opening. Sweep up the string, repair its compressed bottom, wash in a sand plug till depth of the nearest to a gas-water contact - GWC clay sub layer, descend in to the string a tail from casing pipes of a smaller diametre up to the sand plug head, with the tail head dislocation 20 m above of the reservoir roof, cement the tail with a cement slurry, leaving a cement barrel 1-2 m higher the tails shoe. After cement fixing - CFT drill the cement barrel, wash the sand plug up to the current GWC, through perforation holes with perforation interval 15-20 m3 of the water sealing composition, press it through 3-5 m3 of the cement slurry in to the reservoir, creating water sealing screen and stop over the defined height cement barrels sand plug. After the CFT execute perforation - hydro-sand-jetted or with powerful cumulative perforator - of the production string and the tail in interval over cement barrel head up to the reservoir roof and gas flow activation. The cement slurry contains portlandcement, superplastisiser C-3, polyvinyl alcohol, and polypropylene fiber.
EFFECT: well efficiency recovery and stand by wells operation start up reliability increase.
1 ex, 4 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| METHOD OF RECOVERY OF YIELD AND BRINGING TO OPERATION OF TEMPORARILY SHUT-IN WELLS WITH COMPLICATED STRUCTURE OF COLLECTORS UNDER CONDITIONS OF ABNORMALLY LOW BED PRESSURE | 2008 | 
 | RU2370637C1 | 
| METHOD OF RECOVERY OF YIELD AND BRINGING TO OPERATION OF TEMPORARILY SHUT-IN WELLS WITH COMPLICATED STRUCTURE OF COLLECTORS UNDER CONDITIONS OF ABNORMALLY LOW BED PRESSURE AND HEAVY WATERING | 2008 | 
 | RU2370636C1 | 
| RECOVERY METHOD OF WATER-PRODUCING OIL-AND-GAS WELL IN CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES | 2009 | 
 | RU2410529C1 | 
| METHOD OF RECOVERY OF FLOODED GAS WELL WITH COLLAPSED PRODUCTION TUBING IN PRODUCTIVE INTERVAL | 2011 | 
 | RU2465434C1 | 
| METHOD FOR ISOLATION OF RESERVOIR WATER INFLOW IN WELL WITH BUCKLED FLOW STRING UNDER CONDITIONS OF ABNORMALLY LOW RESERVOIR PRESSURES | 2009 | 
 | RU2405930C1 | 
| METHOD FOR ISOLATION OF RESERVOIR WATER INFLOW IN WELL WITH BUCKLED FLOW STRING UNDER CONDITIONS OF ABNORMALLY LOW RESERVOIR PRESSURES | 2009 | 
 | RU2405931C1 | 
| METHOD OF WELL ABANDONMENT WITH COLLAPSED PRODUCTION STRING | 2009 | 
 | RU2403376C1 | 
| ISOLATION METHOD OF BRINE WATER INFLUX IN WELL | 2012 | 
 | RU2488692C1 | 
| DEVELOPMENT METHOD OF GAS WELL WITHOUT PACKER IN CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES | 2009 | 
 | RU2399756C1 | 
| DEVELOPMENT METHOD OF GAS WELL WITH PACKER IN CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES | 2009 | 
 | RU2399757C1 | 
Authors
Dates
2010-01-20—Published
2008-04-21—Filed