FIELD: oil and gas industry.
SUBSTANCE: invention refers to development of gas wells with packer in conditions of abnormally low formation pressures - ALFP. Development method of gas well with packer in ALFP conditions involves gas supply from operation wells to booster compression station - BCS, where gas is compressed to the pressure of 5.0-5.5 MPa. After BCS the gas is supplied to gas processing facility - GPF, where gas is cleaned from mechanical impurities and water, and gas is supplied under pressure of 3.0-4.0 MPa to cluster site of the developed well and then to booster station to which process water is pumped at the same time. The obtained liquid-gas mixture is compressed to the value of 7.0-10.0 MPa; after that gas-liquid mixture is supplied to separator where gas-liquid mixture is separated into high pressure gas and liquid. Liquid is supplied to pump station, and high pressure gas is supplied to ejector to which there also supplied is foam-forming liquid - FFL. Aerated foam-forming liquid - AFFL obtained on ejector is supplied to flexible pipe - FP of coil tubing unit which is lowered to tube space of the well with stops in every 50-100 m. At each FP burial step the supply of FFL to ejector is stopped, and high pressure gas is supplied to FP by passing the ejector, forcing away damping liquid and AFFL to day surface and by performing well ventilation till gas influx is obtained from productive formation. After gas influx is obtained, the well is developed till it is brought to process mode; after that FP is removed from well, and well is brought into operation.
EFFECT: reducing the time required for well development and providing influx from formation of gas well with packer in ALFP conditions with abnormal coefficient lower than 0,2.
1 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT METHOD OF GAS WELL WITHOUT PACKER IN CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES | 2009 |
|
RU2399756C1 |
DEVELOPMENT METHOD OF GAS WELL UNDER CONDITIONS OF ABNORMALLY LOW PRESSURE OF FORMATION (VERSIONS) | 2011 |
|
RU2455477C1 |
FLUSHING METHOD OF SAND PLUG IN GAS WELL IN CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES | 2010 |
|
RU2445446C1 |
METHOD FOR WELL COMPLETION | 2003 |
|
RU2235868C1 |
METHOD OF RECOVERY OF YIELD AND BRINGING TO OPERATION OF TEMPORARILY SHUT-IN WELLS WITH COMPLICATED STRUCTURE OF COLLECTORS UNDER CONDITIONS OF ABNORMALLY LOW BED PRESSURE | 2008 |
|
RU2370637C1 |
METHOD OF SAND PLUG WASHING UP AND PREVENTION OF SAND ADDITION IN WATERING WELL | 2007 |
|
RU2342518C1 |
RECOVERY OF SELF-SQUEEZING GAS WELL WITH ABNORMALLY LOW SEAM PRESSURE | 2013 |
|
RU2539060C1 |
METHOD OF WASHING OF SAND PLUG AND PREVENTION OF ADDITION OF SAND IN WATER PRODUCER UNDER CONDITIONS OF LIFTING OF GAS-WATER CONTACT | 2007 |
|
RU2341645C1 |
WELL EFFICIENCY RECOVERY AND START UP OF STAND BY WELLS WITH COMPLICATED DESIGN COLLECTORS IN ALFP CONDITIONS AND PRODUCTION STRING BOTTOM PART COLLAPSE | 2008 |
|
RU2379498C1 |
METHOD OF RECOVERY OF YIELD AND BRINGING TO OPERATION OF TEMPORARILY SHUT-IN WELLS WITH COMPLICATED STRUCTURE OF COLLECTORS UNDER CONDITIONS OF ABNORMALLY LOW BED PRESSURE AND HEAVY WATERING | 2008 |
|
RU2370636C1 |
Authors
Dates
2010-09-20—Published
2009-06-16—Filed