FIELD: oil-and-gas industry.
SUBSTANCE: well absorption zone sealing method includes viscoelastic composition and cement slurry gradual pumping into the well, at that pump into the well absorption zone a reagent concentrated water solution, which able to create a three dimension structure in the reservoir, and then the cement slurry, solving with the reagent thin water solution. Use following reagents for the three dimension structure creation in the reservoir: chloride aluminium, carbamide, urotropin, at the following components ratio wt %: chloride aluminium - 4-8, carbamide - 5-30, urotropin - 0-6, the rest is water. As cement grouting liquid used 3-20 times reagent water solution.
EFFECT: well absorption zones sealing efficiency increase.
2 cl, 3 tbl
Title | Year | Author | Number |
---|---|---|---|
VISCOELASTIC STRUCTURE FOR ISOLATION WORKS IN WELLS OF REFINED PAPER PRODUCTS AND POLYACRYLAMIDE ON BASIS OF FRESH WATER | 2016 |
|
RU2625128C1 |
METHOD OF INCREASING OIL RECOVERY OF FORMATIONS | 2020 |
|
RU2735821C1 |
METHOD FOR PRODUCTION WELL REPAIR | 2005 |
|
RU2322569C2 |
WELLS HIGH INTENSITY ABSORPTION INTERVALS INSULATION METHOD AND AERATED SLURRY FOR ITS EXECUTION | 2008 |
|
RU2379474C2 |
METHOD OF FORMATION ISOLATION WITH CEMENT-SILICATE MUD | 2012 |
|
RU2519262C1 |
METHOD FOR CEMENTING CASING STRINGS IN PRESENCE OF LOSS ZONES | 2021 |
|
RU2794264C2 |
METHOD CONTROL OVER OIL DEPOSIT DEVELOPMENT | 2010 |
|
RU2467165C2 |
METHOD OF REPAIR-INSULATION WORKS IN OIL AND GAS WELL | 2019 |
|
RU2723416C1 |
METHOD FOR SMOOTHING ACCELERATION PROFILE OF FORCE-PUMP WELLS | 2002 |
|
RU2224878C2 |
METHOD OF LIMITING WATER INFLUX INTO EXTRACTING WELLS | 2002 |
|
RU2224875C2 |
Authors
Dates
2010-02-20—Published
2008-06-04—Filed