FIELD: oil-and-gas production.
SUBSTANCE: in a wells high intensity absorption intervals insulation method execute cement slurry pumping, then - a polymer content, at that use an aerated solution as the slurry, with the base, mass p. Portland cement 85-100,alluminium silicate micro spheres up to 15, foam creator - anion SAS base on a resin and naphthene acid basis 0.1-0.3, setting time activator 4.0-7.0, water 50-60, and additionally - gas agent in quantity, providing the mentioned above solution density 800-1000 kg/m3, and a poly-cement paste used as the polymer solution, created by mixing compositions I and II of a defined content. Invention develops in formula subclaime.
EFFECT: insulation works time consumption decrease, creating a reliable insulation in a catastrophic absorption conditions.
6 cl, 1 ex, 2 tbl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
ISOLATION METHOD OF WATER INFLUX TO WELL | 2010 |
|
RU2425957C1 |
ACID-SOLUBLE LIGHTWEIGHT PLUGGING MATERIAL TO LIQUIDATE ABSORPTION IN PRODUCTIVE FORMATIONS | 2014 |
|
RU2575489C1 |
LIGHT INSULATING BACKFILL | 2010 |
|
RU2448999C1 |
GROUTING COMPOSITION FOR INSULATION OF ZONES OF INTENSIVE ABSORPTION | 2013 |
|
RU2542063C1 |
INSULATING COMPOSITION FOR PROTECTION FROM INTENSIVE ABSORPTION IN INTERVALS OF FISSURED ROCKS | 2014 |
|
RU2553753C1 |
FOAM CEMENT BACKFILL MATERIAL | 2017 |
|
RU2654112C1 |
CEMENTING METHOD FOR WELL WITH ABNORMALLY LOW RESERVOIR PRESSURE | 2006 |
|
RU2320848C1 |
FOAM-CEMENTING PLUGGING MATERIAL FOR BOREHOLES FIXATION | 2016 |
|
RU2623759C1 |
METHOD FOR PREVENTING OCCURRENCE OF INTER-CASING AND INTER-LAYER FLOWS IN WELL | 2023 |
|
RU2808074C1 |
METHOD FOR ELIMINATION OF INTENSIVE ABSORPTION | 2002 |
|
RU2229015C2 |
Authors
Dates
2010-01-20—Published
2008-03-14—Filed