FIELD: construction.
SUBSTANCE: invention is related to hydrotechnical construction of city and mooring embankments in restricted conditions, when there are some buildings, utilities or roads near to border line. Method for erection of embankment includes deepening rabbet wall and anchor piles into soil. Straight rod is hingedly joined to each anchor pile at first in its horizontal position, and tip is placed on it, which is connected to straight rod and pile-driving mechanism. Then all of them are lifted by crane. Pile in vertical position is deepened into soil by pile-driving mechanism, afterwards rod is disconnected from tip, turned to rabbet wall and embedded into border beam. Tip with pile-driving mechanism are taken off pile and used for deepening of the following piles into soil. Space behind wall is filled with sand.
EFFECT: invention makes it possible to simplify works of embankment erection.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
QUAY | 2005 |
|
RU2310709C2 |
DOCKSIDE WALL | 0 |
|
SU1366581A1 |
RIVERSIDE | 0 |
|
SU1071688A1 |
RETAINING WALL | 0 |
|
SU1442593A1 |
MOORING EMBANKMENT | 0 |
|
SU954541A1 |
MOORING EMBANKMENT | 0 |
|
SU1276740A1 |
SHEET-PILE WALL | 2001 |
|
RU2185476C1 |
MOORING WALL | 0 |
|
SU1418400A1 |
RETAINING WALL | 0 |
|
SU1263752A1 |
ANCHOR PILE | 0 |
|
SU732446A1 |
Authors
Dates
2010-03-20—Published
2008-10-24—Filed