FIELD: oil-and-gas production.
SUBSTANCE: method is implemented on the basis of waterflooding with application of horizontal producing wells and vertical pressure wells. According to the invention, vertical pressure wells are located in corners of five-point element. In those there are opened by perforation one third part in bottom part of productive stratum. Horizontal producing well is located nearby the roof of productive stratum parallel to two sides of square in the centre of five-point element with length of bore equal to one third of distance between pressure well bottom.
EFFECT: effectiveness increase of development of oil pool at presence in productive cut of supercollector.
2 tbl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TREATMENT OF A DEPOSIT OF HIGHLY VISCOUS OIL | 2005 |
|
RU2297524C2 |
METHOD OF IMPLEMENTATION OF VERTICAL WATER FLOODING OF OIL DEPOSIT | 2007 |
|
RU2342523C2 |
DEVELOPMENT METHOD FOR GAS-AND-OIL FIELD CHARACTERIZED BY HIGHLY-VISCOUS OIL | 2005 |
|
RU2295634C2 |
METHOD OF DEVELOPMENT OF OIL FIELD WITH NONUNIFORM RESERVOIRS AND DIFFICULTLY RECOVERABLE OIL RESERVES | 2002 |
|
RU2215128C1 |
A METHOD OF DEVELOPMENT OF OIL POOL WITH LOW-PERMEABILITY RESERVOIRS | 2002 |
|
RU2208140C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSITS IN BAZHENOV FORMATION | 2012 |
|
RU2513963C1 |
METHOD OF OIL POOL DEVELOPMENT | 2001 |
|
RU2188311C1 |
METHOD FOR DEVELOPMENT OF OIL RIM OF OIL AND GAS CONDENSATE RESERVOIR | 2010 |
|
RU2433253C1 |
METHOD FOR EXTRACTING WATER-OIL ZONE OF OIL DEPOSIT | 2004 |
|
RU2288355C2 |
METHOD OF DEVELOPING LOW-PERMEABLE OIL DEPOSIT USING SEPARATE INJECTION OF WATER AND GAS | 2018 |
|
RU2731243C2 |
Authors
Dates
2010-04-10—Published
2008-08-11—Filed