FIELD: oil-and-gas production.
SUBSTANCE: there is implemented mudding of pit-bottom zone of well in the range of bedding of all permeable beds and interlayers up to producing formation before downlifting of casing string. Additionally mudding is implemented with usage of molecular fine-particle plugging solution. Fixation of casing pipes is implemented by plugging solution density of stone of which is equal to 1.0-1.1 of average density of formations, opened by well. In structure of deep well the letter technical and production strings are equipped by fragments-insertions of specified length, allowing enough strength characteristics for operation of well, but easily destroyed by known methods. Proposed technology provides increasing of quality of fixation of casing strings and to prevent interstratal overflows.
EFFECT: increased range of application of plugging solution and increased operation time of plugging stone, included into structure of the well fragments of insertion provide ability of direct contact of plugging material with rock.
5 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHODS OF ISOLATION OF THE PRODUCTIVE STRATA OVERLAPPED BY THE CASING STRINGS AND THE GROUTING MORTAR FOR ITS EXERCISE | 2005 |
|
RU2299230C2 |
METHOD FOR MAKING A BOTTOMHOLE FILTER | 2005 |
|
RU2288351C1 |
WELL KILLING METHOD | 2004 |
|
RU2283942C2 |
HYDROGEN SULPHIDE RESISTANT GROUTING MORTAR | 2011 |
|
RU2471843C1 |
HYDROGEN SULPHIDE RESISTANT SEALING INHIBITED GROUTING MORTAR | 2015 |
|
RU2588078C1 |
TREATMENT METHOD OF HIGH-PERMEABILITY OF WELL | 2008 |
|
RU2386786C2 |
WELL COMPLETION METHOD IN CONDITIONS OF ABNORMALLY HIGH FORMATION PRESSURE | 2023 |
|
RU2821629C1 |
GYPSUM-MAGNESIUM GROUTING MORTAR | 2013 |
|
RU2524774C1 |
LIGHTENED SULPHUR-BEARING GROUTING MORTAR | 2013 |
|
RU2524771C1 |
WELL KILLING METHOD | 2004 |
|
RU2282712C2 |
Authors
Dates
2010-04-20—Published
2008-06-30—Filed