FIELD: oil-and-gas production.
SUBSTANCE: method includes alignment of filtration and strength characteristics of bore by water jets and pumping of plugging and/or gel-forming mixture with ability of following control of airtightness of bore with hydraulic test of stratum after each stage of insulation.
EFFECT: increasing of airtightness and strength of bore in joint ranges with incompatible geological-and-physical conditions of drilling, enhancement of structures of depth wells.
2 tbl
Title | Year | Author | Number |
---|---|---|---|
CONSTRUCTION METHOD OF DEEP WELL, PLUGGING SOLUTION FOR ITS IMPLEMENTATION AND STRUCTURE OF DEEP WELL | 2008 |
|
RU2386787C9 |
METHOD OF WELL CEMENTING | 2000 |
|
RU2208129C2 |
METHOD FOR ISOLATION OF FLUID INFLOWS INTO WELL | 2018 |
|
RU2701668C1 |
METHOD OF HYDRAULIC ISOLATION OF FORMATIONS IN COMPLETION OF WELL CONSTRUCTION | 1999 |
|
RU2194842C2 |
METHOD OF WELL COMPLETION | 1997 |
|
RU2140521C1 |
SLIM HOLE WELL CONSTRUCTION METHOD | 2009 |
|
RU2393320C1 |
PROCESS OF ISOLATION OF WATER-SATURATED POOLS IN OPERATIONAL WELLS | 2000 |
|
RU2174595C1 |
ISOLATION OF WATER INFLOW BEDS AT WELL CONSTRUCTION | 2013 |
|
RU2526061C1 |
METHOD OF ISOLATION OF ABSORPTION ZONES DURING WELL DRILLING | 2020 |
|
RU2743123C1 |
METHOD FOR WELL CONSTRUCTION IN COMPLICATED CONDITIONS | 2016 |
|
RU2630519C1 |
Authors
Dates
2010-04-20—Published
2008-02-14—Filed