FIELD: construction.
SUBSTANCE: ceiling curb system comprises multiple latticed elements, which consist each of multiple long beams passing parallel to each other and at least one cross beam mounted or laid onto vertical supports and passing across long beams, at the same time long and cross beams of latticed elements are rigidly connected to each other, and at the same time standard latticed elements have two cross beams provided in opposite end zones of long beams, while latticed elements for transverse leveling have two cross beams arranged with displacement inside compared to standard latticed elements.
EFFECT: increased operational reliability.
18 cl, 12 dwg
Title | Year | Author | Number |
---|---|---|---|
SIDE GUARD, SYSTEM OF FORMWORK, HAVING AT LEAST ONE SUCH SIDE GUARD, AND METHOD OF INSTALLATION OF SUCH SIDE GUARD | 2017 |
|
RU2734199C2 |
METHOD FOR MANUFACTURING OF WALL-CEILING STRUCTURE IN REINFORCED CONCRETE VERSION | 2005 |
|
RU2368742C1 |
CEILING CONCRETE FORM | 2000 |
|
RU2162128C2 |
TIMBERING SYSTEM FOR CONCRETE SLABS | 2003 |
|
RU2329364C2 |
SUPPORT HEAD, CEILING SUPPORT AND CEILING FORMWORK HAVING SUCH CEILING SUPPORT | 2016 |
|
RU2722021C2 |
FORMWORK SHIELD | 1991 |
|
RU2032801C1 |
INSTALLATION FOR PRODUCING MONOLITHIC BULK REINFORCED-CONCRETE ARTICLES,TYPE "DOME" | 0 |
|
SU1344237A3 |
FORM-WORK WITH BRACKET MOULDING MEMBER | 1996 |
|
RU2152494C1 |
CONNECTING DEVICE FOR CONNECTION OF TWO CURB ELEMENTS | 2007 |
|
RU2383702C2 |
INSTALLATION FOR MAKING SPATIAL ELEMENTS | 0 |
|
SU1206099A1 |
Authors
Dates
2010-04-27—Published
2006-06-30—Filed