FIELD: construction.
SUBSTANCE: method for opening of trench and lifting of underground pipeline in process of dismantling and capital repair includes ripping and removal of vegetable and mineral filling soil. Lifting of pipeline and its laying onto soil surface along trench axis. Besides ripping and removal of vegetable and mineral filling soil is done synchronously by motion of multi-row trolley suspension and lifting of pipelines by rippers connected to tractors.
EFFECT: reduced resistance to pipeline withdrawal and increased labour intensity.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR BREAKING PIPE LINE OFF GROUND AND HOISTING | 1996 |
|
RU2105226C1 |
METHOD TO DISMANTLE MANIFOLD PIPELINE | 2014 |
|
RU2565118C2 |
PIPELINE DISMANTLING COMPLEX | 1992 |
|
RU2053429C1 |
METHOD OF DISMANTLING DECOMMISSIONED OIL PIPELINE | 2015 |
|
RU2585158C1 |
DISMANTLING METHOD OF DECOMMISSIONING GAS OR OIL PIPELINE | 2019 |
|
RU2718099C1 |
SYSTEM FOR WITHDRAWING AND CLEANING PIPE LINE | 0 |
|
SU1733813A1 |
METHOD FOR DISMANTLING METALLIC PIPELINES AND DEVICE FOR REALIZATION OF SAID METHOD | 2001 |
|
RU2227856C2 |
METHOD OF DISMANTLING A PIPELINE FOR DECOMMISSIONING OR FOR REPAIR PURPOSES | 2019 |
|
RU2701652C1 |
METHOD OF SUPPORTING UNDERGROUND PIPELINE DURING REPAIRING | 2000 |
|
RU2235242C2 |
DEVICE FOR REMOVING PIPE LINE FROM SOIL | 1992 |
|
RU2067248C1 |
Authors
Dates
2010-05-20—Published
2008-03-24—Filed