FIELD: construction.
SUBSTANCE: pipeline is supported during repairing with the use of the pipe-layer provided with the trolley suspension. The pipeline is additionally supported with a pillar which does not touch the bottom of the trench, e.g. is located at a distance of 0.1 m.
EFFECT: enhanced reliability of pipeline.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PIPELINE EMBEDDING | 2007 |
|
RU2370696C2 |
METHOD FOR HOLDING PIPELINE DURING ITS MECHANIZED CLEANING OF INSULATION AT THE EDGE OF TRENCH | 2022 |
|
RU2803684C1 |
DEVICE FOR DIGGING SOIL FROM UNDER THE PIPELINE | 2000 |
|
RU2252302C2 |
METHOD FOR OPENING OF TRENCH AND LIFTING OF UNDERGROUND PIPELINE IN PROCESS OF DISMANTLING AND CAPITAL REPAIR | 2008 |
|
RU2389930C2 |
SELF-PROPELLED SYSTEM FOR REPAIR OF UNDERGROUND PIPE LINE | 2000 |
|
RU2198336C2 |
DEVICE FOR BREAKING PIPE LINE OFF GROUND AND HOISTING | 1996 |
|
RU2105226C1 |
DEVICE FOR COMPACTING SOIL IN TRENCH UNDER PIPELINE | 2000 |
|
RU2249080C2 |
TRENCH TYPE TUBE HANDLING APPARATUS | 1999 |
|
RU2170378C2 |
PROCEDURE FOR REPAIR OF PIPELINE | 2008 |
|
RU2425273C2 |
METHOD OF CHECK OF OPERATING PIPE LINE WITHOUT DISCONTINUATION OF PUMPING | 0 |
|
SU1828987A1 |
Authors
Dates
2004-08-27—Published
2000-09-07—Filed