FIELD: oil-and-gas industry.
SUBSTANCE: oil or gas well production monitoring device comprises self-contained geophysical instruments mounted below production pump with the help[ of anchors in intervals of analysed beds. Right above top anchor a guide funnel is fixed with its upper part accommodating stem on lugs and its lower part housing contact sleeve to cable terminal to be connected thereto. Top and bottom cylinders are fixed above and below extraction pump with their funnels directed upward and downward, respectively. Note here that one of the funnel walls is arranged vertically at the distance of 3 to 5 mm from the cylinder outer wall. Tube is arranged between top and bottom cylinders in funnels holes to accommodate geophysical cable with contact rod to move therein. Note also that bells are arranged above guide funnel and top cylinder cowl, each with diametre smaller than that of cowl by two diametres of geophysical cable, plus 10 to 15 mm.
EFFECT: higher accuracy of data.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO MONITOR MULTI-FORMATION WELL | 2008 |
|
RU2387824C1 |
MONITORING METHOD OF MULTI-BED WELL WITH ELIMINATION OF CROSS-FLOWS BETWEEN BEDS | 2008 |
|
RU2368772C1 |
METHOD TO PRODUCE OIL OR GAS FROM MULTIPAY WELL | 2008 |
|
RU2377394C1 |
METHOD TO MONITOR WELL AND DEVICE TO THIS END | 2008 |
|
RU2387830C1 |
WELL FLOW RATE INCREASING METHOD | 2008 |
|
RU2400623C2 |
MULTIPLE SENSOR DEVICE WITH DIFFERENT PARAMETERS TO MONITOR THE RESERVOIR FLOW PROFILE BY MULTIPLE METHODS | 2020 |
|
RU2752068C1 |
METHOD OF SIMULTANEOUS SEPARATE OR SUCCESSIVE PRODUCTION OF RESERVOIR FLUID FROM WELL OF MULTIPAY FIELDS WITH PRELIMINARY INSTALLATION OF PACKERS | 2014 |
|
RU2552555C1 |
PLANT FOR DUAL OPERATION OF MULTIPLE-ZONE WELL WITH TELEMETRY SYSTEM | 2012 |
|
RU2512228C1 |
SWABBING METHOD WITH WELL MONITORING | 2008 |
|
RU2388909C1 |
BY-PASS SYSTEM OF OIL WELL PUMPING UNIT FOR DUAL PUMPING OF WELL HAVING AT LEAST TWO FORMATIONS, BY-PASS SYSTEM OF OIL WELL PUMPING UNIT FOR SINGLE AND MULTIPLE ZONE WELLS AND BY-PASSING METHOD FOR WELL SURVEY | 2012 |
|
RU2495280C1 |
Authors
Dates
2010-06-10—Published
2008-05-28—Filed