FIELD: machine building.
SUBSTANCE: pipeline (17) of high pressure (HPP) and pipeline (18) of low pressure (LPP) of main are connected to drain tube (8) coupled with cavity of ball cock (9) by means of pulse tube (10) of high pressure (HPPT) and pulse tube (11) of low pressure (LPPT). Three valves (1, 2, 5) and flow metre (14) are installed in the drain tube. Two by-pass tubes (12, 13) with valves are arranged parallel to the drain tube. By switching corresponding valves transported medium is first directed downstream through the first packing (20) of cock (9) and further through the second packing (21) of the cock. Also fluid medium always flows from inlet to outlet of the flow metre (for example, vortex or heat one), which readings are accepted as value of medium leaks though a ball cock.
EFFECT: facilitating control of leaks through each packing of ball cock.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
SYSTEM FOR CONTROL OVER TIGHTNESS OF MAIN GAS PIPELINE STOP BALL VALVE | 2011 |
|
RU2460936C1 |
TEST STAND FOR BALL VALVES (VERSIONS) | 2009 |
|
RU2397464C1 |
SYSTEM OF FLUID AND GAS LEAKS CONTROL IN BALL COCKS OF MAINS | 2009 |
|
RU2396484C1 |
PROCEDURE FOR CONTROL OVER TIGHTNESS OF BALL VALVE OF MULTI-PURPOSE ACCESSORIES OF MAIN AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) | 2010 |
|
RU2422789C1 |
METHOD FOR MEASUREMENT OF GAS FLOW THROUGH UNTIGHT GATE OF CLOSED BALL VALVE OF STOP AND CONTROL VALVES OF MANIFOLD PIPELINE AND DEVICE FOR ITS IMPLEMENTATION | 2009 |
|
RU2393380C1 |
GAS-TURBINE UNIT | 2004 |
|
RU2326252C1 |
GAS TURBINE PLANT | 2004 |
|
RU2358134C2 |
STAND FOR CALIBRATION AND PRIMARY VERIFICATION OF FLOW DENSITY CONVERTERS | 2024 |
|
RU2826164C1 |
METHOD AND DEVICE FOR MEASURING HEAT ENERGY AND FLOW RATE OF HEAT TRANSFER AGENT IN OPEN WATER HEAT SUPPLY SYSTEMS | 2006 |
|
RU2310820C1 |
NATURAL GAS ODORISER | 2009 |
|
RU2399947C1 |
Authors
Dates
2010-08-10—Published
2009-05-07—Filed