FIELD: electricity.
SUBSTANCE: it is proposed to use busbar (8) with at least two first conductors of split phase (18, 19), at least with two second conductors of split phase (20, 21) and at least two third conductors of split phase (29, 30) arranged between the first conductors of split phase (18, 19) and the second conductors of split phase (20, 21). Besides the third conductors of split phase (29, 30) across longitudinal direction of busbar (22) protrude over the first and second conductors of split phase (18, 19, 20, 21).
EFFECT: higher loading capacity by current in conductors of split phase.
23 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
BUSBAR SYSTEM FOR TWO-WAY ELECTRIC DISTRIBUTION DEVICE | 2006 |
|
RU2408963C2 |
SYSTEM OF BUSBARS FOR ELECTRIC SWICH-GEAR | 2006 |
|
RU2400893C2 |
HIGH-VOLTAGE SINGLE-PHASE OR MULTIPHASE SWITCHGEAR | 0 |
|
SU1166673A3 |
DEVICE FOR SOFT START CONTROL AND SHUTDOWN OF THREE-PHASE ELECTRIC MOTORS (SOFT STARTER) | 2008 |
|
RU2382459C1 |
DISTRIBUTION CABINET SYSTEM | 2007 |
|
RU2406197C2 |
CONNECTING DEVICE FOR SWITCHGEAR CUBICLE WITH DRAW-OUT EQUIPMENT MODULES | 2002 |
|
RU2251771C1 |
SEALED MODULE WITH DISCONNECTORS FOR DISTRIBUTION DEVICE WITH GAS INSULATION | 2010 |
|
RU2518516C2 |
CURRENT CONDUCTOR | 2012 |
|
RU2581848C2 |
DISMOUNTABLE ASSEMBLED SHELVING | 2003 |
|
RU2242908C1 |
HEAVY CURRENT RECTIFYING DEVICE | 0 |
|
SU674696A3 |
Authors
Dates
2010-08-27—Published
2006-09-18—Filed