FIELD: oil and gas production.
SUBSTANCE: horizontal bore of well is drilled in oil-non-saturated section of producer; whereupon annular space between casing and rock of horizontal bore of well is cemented. A hydro-mechanical slit perforator performs perforation azimuthally directed with intervals per one round-trip operation. Further, there are lowered packers cutting each interval equal to length of a formed slit from the rest part of the string. Hydraulic breakdown of the formation in a horizontal section of the well is carried out successively starting from the perforated section of the horizontal bore of the well distant from axis of a vertical bore of the well. Also hydro-mechanical slit perforation is double-sided; the slits are arranged at 180° relative to each other in vertical plane opposite to each other relative to axis of the horizontal bore of the well in one interval. Hydro-mechanical slit perforation can be also made one-sided with a turn of 180°in vertical plane relative to axis of the horizontal bore of the plane in turn every other following interval, or in staggered way equal to length of a formed slit. One-sided hydro-mechanical slit perforation is made in the direction of a formation roof at low thickness of the producer and at active bottom water.
EFFECT: raised efficiency of directional HBF and minimised amount of round-trip operations at secondary formation opening-out before HBF.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR DIRECTIONAL HYDRAULIC BREAKDOWN OF FORMATION IN TWO HORIZONTAL BORES OF WELL | 2009 |
|
RU2401943C1 |
METHOD OF DIRECTED HYDRAULIC FRACTURING OF RESERVOIR | 2010 |
|
RU2452854C2 |
METHOD OF MULTIPLE HYDROFRACTURING OF FORMATION IN OPEN HOLE OF HORIZONTAL WELL | 2013 |
|
RU2537719C1 |
INTERVAL HYDRAULIC FRACTURING OF CARBONATE FORMATION IN HORIZONTAL WELLBORE WITH BOTTOM WATER | 2014 |
|
RU2558058C1 |
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL BOREHOLE OF WELL | 2019 |
|
RU2708747C1 |
METHOD OF LAYER MULTIPLE HYDRAULIC FRACTURING IN INCLINED BOREHOLE | 2015 |
|
RU2601881C1 |
MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN WELL HORIZONTAL SHAFT | 2014 |
|
RU2547892C1 |
METHOD FOR HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL SHAFT OF WELL | 2016 |
|
RU2613403C1 |
METHOD FOR FORMATION HYDRAULIC FRACTURING IN HORIZONTAL OPEN WELL SHAFT | 2014 |
|
RU2541693C1 |
METHOD OF INTENSIFICATION OF WELL OPERATION AFTER ITS CONSTRUCTION | 2019 |
|
RU2724705C1 |
Authors
Dates
2010-10-20—Published
2009-06-30—Filed