MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN WELL HORIZONTAL SHAFT Russian patent published in 2015 - IPC E21B43/267 

Abstract RU 2547892 C1

FIELD: oil-and-gas industry.

SUBSTANCE: proposed method comprises drilling the well horizontal shaft in oil-saturate section of production bed, cementing of annulus between casing and bed rock. Casing pipe is perforated in said well shaft oriented in azimuth by intervals with the help of slot perforator lowered in the well on string in a single trip. String with packer is lowered in the well to fit the packer in place. Fracturing fluid is injected via said string for hydrofracturing in said horizontal well shaft. Well shaft us drilled in the bed parallel with direction of minimum main strain. Plug is fitted at string lower end and two packers are arranged at flexing pipe string. Note here that through holes are made at the latter. Said flexing pipe string with packers is lowered into well shaft for hydraulic fracturing via perforated intervals by cutting of every interval of perforation on both sides. Bed fracturing is started from horizontal well interval nearby the bottom and fluid is forced via flexible pipe string via through holes at flow rate of 2 m3/min to produce transverse fractures from perforation interval relative to well shaft. Note here that fracturing fluid is composed of hydrocarbon-based cross-linked gel. Made fractures are secured by injection of proppant of 12/18 mesh fraction with cross-linked gel, a carrier fluid. Packers are removed to displace flexible pipe string for hydraulic fracturing of the bed in the next perforation interval. Then, above jobs are reiterated. Then, flexible piper string with packers is withdrawn from the well to lower pipe string therein. Packer is fixed at well vertical part for hydraulic fracturing by injection of fluid via horizontal well shaft to produce lengthwise fractures at flow rate of 8 m3/min. Linear gel is used as fracturing fluid. Said lengthwise fractures are secured by injection of ground quartz with linear gel as carrier fluid.

EFFECT: higher efficiency of fracturing.

2 dwg

Similar patents RU2547892C1

Title Year Author Number
METHOD OF LAYER MULTIPLE HYDRAULIC FRACTURING IN INCLINED BOREHOLE 2015
  • Nasybullin Arslan Valerevich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
RU2601881C1
METHOD FOR HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL SHAFT OF WELL 2016
RU2613403C1
METHOD FOR FORMATION HYDRAULIC FRACTURING IN HORIZONTAL OPEN WELL SHAFT 2014
  • Rakhmanov Rafkat Mazitovich
  • Ismagilov Fanzat Zavdatovich
  • Garifov Kamil' Mansurovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
RU2541693C1
INTERVAL HYDRAULIC FRACTURING OF CARBONATE FORMATION IN HORIZONTAL WELLBORE WITH BOTTOM WATER 2014
  • Makhmutov Il'Gizar Khasimovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Girfanov Il'Dar Il'Jasovich
  • Mansurov Ajdar Ul'Fatovich
RU2558058C1
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL BOREHOLE OF WELL 2019
  • Khusainov Ruslan Fargatovich
  • Ismagilov Fanzat Zavdatovich
  • Tabashnikov Roman Alekseevich
RU2708747C1
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL SHAFT OF WELL 2017
  • Nasybullin Arslan Valerevich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
RU2667240C1
METHOD FOR MULTIPLE FORMATION HYDRAULIC FRACTURING IN HORIZONTAL WELL SHAFT 2013
  • Ismagilov Fanzat Zavdatovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Sulejmanov Farid Bashirovich
  • Salimov Vjacheslav Gajnanovich
RU2539469C1
METHOD FOR HYDRAULIC FRACTURING OF PRODUCTIVE FORMATION WITH CLAY LAYER AND GAS-BEARING HORIZON 2016
  • Nasybullin Arslan Valerevich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
RU2618544C1
METHOD OF PRODUCTIVE FORMATION HYDRAULIC FRACTURING WITH CLAY LAYER AND GAS-BEARING HORIZON 2016
  • Nasybullin Arslan Valerevich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
RU2613689C1
METHOD OF INTENSIFICATION OF WELL OPERATION AFTER ITS CONSTRUCTION 2019
  • Ismagilov Fanzat Zavdatovich
  • Lutfullin Azat Abuzarovich
  • Khusainov Ruslan Fargatovich
RU2724705C1

RU 2 547 892 C1

Authors

Makhmutov Il'Gizar Khasimovich

Salimov Oleg Vjacheslavovich

Zijatdinov Radik Zjauzjatovich

Salimov Vjacheslav Gajnanovich

Dates

2015-04-10Published

2014-03-26Filed