FIELD: mining.
SUBSTANCE: proposed method comprises dividing ore body into layers to be mined in descending order, making layers starting heading, extracting ore in pulls and flushing the pulls by hardening materials. In extracting the pull first layer, ore cross extension is developed, while lengthwise axes of pulls in the second and next layers are arranged at an angle to lengthwise axes of breakage pulls driven in above-located layers. Second and next layers are excavated under filling mass with permanent lag from filling mass boundary in above-located layer that is defined from claimed expression. In using the same starting preparatory workings, drifts or orts, in adjacent layers, angle between lengthwise axes of pulls is defined from the claimed expression. In using unlike starting preparatory workings, drifts or orts, in adjacent layers, angle between lengthwise axes of pulls is taken to equal 45-90°.
EFFECT: higher safety of mining, lower costs.
3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINING HEAVY STEEPLY DIPPING DEPOSITS OF UNSTABLE ORE | 2013 |
|
RU2535859C1 |
METHOD TO MINE THICK STEEP DEPOSITS OF UNSTABLE ORES | 2012 |
|
RU2490459C1 |
METHOD OF DEVELOPMENT OF POWERFUL STEEPLY DIPPING DEPOSITS OF UNSTABLE ORES | 2013 |
|
RU2528188C1 |
METHOD TO MINE THICK STEEP DEPOSITS OF UNSTABLE ORES | 2010 |
|
RU2445461C1 |
METHOD TO MINE THICK STEEP DEPOSITS OF UNSTABLE ORES | 2012 |
|
RU2490461C1 |
METHOD FOR UNDERGROUND DEVELOPMENT OF STEEPING ORE BODIES IN DESCENTING ORDER WITH CHAMBER SYSTEM | 2022 |
|
RU2790648C1 |
PROCEDURE OF DEVELOPMENT OF THICK STEEP PITCHED ORE BODIES | 2008 |
|
RU2357082C1 |
METHOD TO MINE THICK STEEP DEPOSITS OF UNSTABLE ORE | 2016 |
|
RU2648371C1 |
METHOD TO DEVELOP EDGE ORE BODIES WITH UNSTABLE ORES | 2012 |
|
RU2515285C2 |
DEVELOPMENT METHOD OF THICK STEEPLY DIPPING ORE BODIES | 2012 |
|
RU2502872C1 |
Authors
Dates
2010-11-27—Published
2009-04-22—Filed