FIELD: mining.
SUBSTANCE: invention relates to mining industry and may be used in development of thick edge ore bodies with unstable and precious ores, for instance, kimberlite pipes, by the underground method. The method includes formation of man-made massif with tunnelling and filling of stopes at the cut and undercut layer, descending extraction of reserves under the man-made massif and filling of the mined space. Under the man-made massif they form a transition layer-sublevel by alternate tunnelling of the stopes of the first phase, with height equal to the height of the layer, and stopes of the second phase, the height of which is equal to the height of the layer-sublevel, at the same time the stopes of the first phase is given the shape of the tilted trapezoid in the vertical cross section, and stopes of the second phase - the irregular hexagon, besides, the width of the upper bases of figures of these stopes and width of stopes of the above (undercut) layer are accepted with equal value. Reserves of the deposit below the transition layer-sublevel are mined by chambers in staggered order with a shift to a sublevel. Chambers in the cross section are given the shape of the hexahedron extended along the vertical line. The upper part of the chambers is formed in the form of a trapezoid with size of half of chamber height, the contours of the upper base of which match the contours of the base of the filled stopes of the first phase in the transition layer - sublevel, and contours of the lateral upper sides - with contours of the lower sides of the filled adjacent stopes of the second phase. The lower part of the chamber with the size of half of its height is given the shape of the tilted trapezoid in the vertical cross section.
EFFECT: invention makes it possible to increase intensity of mining of ore deposits, to increase size of an extraction unit and to reduce costs for filling works.
5 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR UNDERGROUND DEVELOPMENT OF STEEPING ORE BODIES IN DESCENTING ORDER WITH CHAMBER SYSTEM | 2022 |
|
RU2790648C1 |
METHOD FOR DEVELOPMENT OF STEEPLY DIPPING ORE BODIES WITH UNSTABLE ORES | 2021 |
|
RU2768251C1 |
METHOD OF DEVELOPING THICK STEEPLY DIPPING ORE BODIES | 2014 |
|
RU2558841C1 |
DEVELOPMENT METHOD OF THICK STEEPLY DIPPING ORE BODIES | 2012 |
|
RU2502872C1 |
METHOD TO DEVELOP EDGE ORE BODIES WITH UNSTABLE ORES | 2012 |
|
RU2514051C2 |
LAYERED ROOM-AND-PILLAR SYSTEM WITH COMPLETE STOWING | 2011 |
|
RU2486340C2 |
MINING METHOD OF THICK STEEP ORE BODIES | 2011 |
|
RU2475647C2 |
METHOD OF MINING HEAVY STEEPLY DIPPING DEPOSITS OF UNSTABLE ORE | 2013 |
|
RU2535859C1 |
METHOD TO MINE THICK STEEP DEPOSITS OF UNSTABLE ORES | 2010 |
|
RU2445461C1 |
METHOD TO MINE THICK STEEP DEPOSITS OF UNSTABLE ORES | 2012 |
|
RU2490461C1 |
Authors
Dates
2014-05-10—Published
2012-04-02—Filed