FIELD: oil and gas production.
SUBSTANCE: method includes installation of device for intensification of gas bleeding by means of pressure reduction in zone of gas bleeding and additional gas inflow from bed into gas wells with direction of products into system of gas collection at wellhead in bore of gas wells. According to invention, debit of gas wells is increased up to value providing for speed of gas flow in lifting string, required for continuous carry-over of liquid-condensate from gas wells bottomhole, which prevents coverage of perforation holes with liquid condensate in gas wells bore.
EFFECT: increasing or maintenance of wells debit, and also durable stable operation of wells without interference of service personnel.
1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF GAS WELL OPERATION | 2019 |
|
RU2722899C1 |
WELL OPERATION METHOD | 2017 |
|
RU2658854C1 |
METHOD OF WELL OPERATION AT THE FINAL STAGE OF DEVELOPMENT OF GAS DEPOSITS | 2019 |
|
RU2733585C1 |
GAS WELL OPERATION METHOD | 2012 |
|
RU2513942C2 |
DEVICE FOR RESERVOIR FLUID REMOVAL FROM GAS WELL | 2012 |
|
RU2516313C2 |
METHOD FOR OPERATING GAS WELLS AT LATER STAGE OF NATURAL GAS FIELD DEVELOPMENT AND DEVICE FOR ITS IMPLEMENTATION | 2021 |
|
RU2760183C1 |
GAS WELL OPERATING METHOD | 2017 |
|
RU2651740C1 |
METHOD OF UNINTERRUPTED OPERATION OF GAS AND GAS CONDENSATE WELLS, PROVIDING REMOVAL OF ACCUMULATED BOTTOMHOLE FLUID | 2019 |
|
RU2722897C1 |
METHOD OF OPTIMAL OPERATION OF GAS AND GAS CONDENSATE WELLS WITH HIGH LIQUID CONTENT | 2018 |
|
RU2706283C2 |
METHOD FOR DETERMINING GAS WELL FLOW RATE PROVIDING CARRY-OVER OF CONDENSED FLUID FROM MINE FACE | 2011 |
|
RU2474686C1 |
Authors
Dates
2010-12-10—Published
2008-10-09—Filed