FIELD: transport.
SUBSTANCE: proposed method comprises running trains on railways. Proposed track consists of two rails, each being jointed together to make clearance with the help of butt straps arranged on both sides of rail. Butt straps are jointed to receiving jail by fixed joint. Butt straps are jointed to sending jail by split joint.
EFFECT: higher safety and reliability, reduced impact loads and noise, longer life.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
RAIL ROAD AND METHOD OF ITS OPERATION | 2010 |
|
RU2418127C2 |
RAIL ROAD AND METHOD OF ITS OPERATION | 2012 |
|
RU2481431C2 |
GUIDE RAIL TRACK AND THE METHOD OF ITS OPERATION | 2010 |
|
RU2441958C2 |
RAIL ROAD AND METHOD OF ITS OPERATION | 2012 |
|
RU2478151C2 |
RAIL GAUGE AND METHOD OF ITS OPERATION | 2010 |
|
RU2453646C2 |
RAILWAY RAIL, GUIDE TRACK AND METHOD OF APPLICATION THEREOF (VERSIONS) | 2009 |
|
RU2401901C2 |
TRACK AND METHOD OF ITS OPERATION | 2010 |
|
RU2421563C2 |
BUTT STRAP AND METHOD OF ITS USE | 2009 |
|
RU2407843C2 |
JOINT BAR (VERSIONS) AND METHOD OF ITS APPLICATION | 2007 |
|
RU2357034C2 |
RAILROAD RAIL AND METHOD OF ITS USE | 2009 |
|
RU2407842C2 |
Authors
Dates
2010-12-27—Published
2009-06-10—Filed