FIELD: construction.
SUBSTANCE: each reinforcement bar comprises its shell, containing metal strand. This method includes the following stages, on which reinforcement elements are pulled into channel so that they protrude at both ends; hardening filler is injected in the whole volume of specified channel; filler is maintained until it fully hardens to fix trajectory of reinforcement elements; operation of joint tensioning of metal strands is carried out, therefore pitch of clearance adjustment in the beginning of tension does not exceed 4% of elongation produced at the end of tensioning operation, afterwards they are stopped at the ends of structure.
EFFECT: reduced costs, improved operational characteristics.
9 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
DOUBLE-WALLED VAULTED BUILDING STRUCTURE ERECTION METHOD | 2003 |
|
RU2261959C2 |
METHOD TO TIGHTEN CABLES | 2014 |
|
RU2548267C1 |
METHOD AND BOBBIN STRUCTURE FOR THREADING REINFORCING ELEMENTS INTO CHANNELS | 2010 |
|
RU2530080C2 |
DEVICE AND METHOD FOR AUTOMATIC TWISTING OF METAL WIRES, IN PARTICULAR FOR CONNECTION OF NEIGHBORING, PREFERABLY CROSSED STRUCTURAL ELEMENTS | 2013 |
|
RU2600779C1 |
DEVICE FOR HAIR STYLING | 2007 |
|
RU2429772C2 |
FOUNDATION FOR WIND TURBINE TOWERS | 2019 |
|
RU2794278C2 |
RIB SUPPORT FOR ATTACHMENT AND REINFORCEMENT OF MINE | 2011 |
|
RU2593854C2 |
ARMATURE CABLE | 2018 |
|
RU2709571C2 |
CONSTRUCTION METHOD FOR BRIDGE OR OVERPASS | 2002 |
|
RU2251604C2 |
TENSILE ELEMENT SUPPLY DEVICE | 2011 |
|
RU2569114C2 |
Authors
Dates
2011-01-20—Published
2008-11-26—Filed