FIELD: oil and gas production.
SUBSTANCE: procedure for treatment of bottomhole zone of pressure well -the BZPW- consists in lowering flexible coiled tubing into well to depth below interval of perforation. Further, there is pumped 0.8-1.2 % washing solution of Neftenol K of grade "NK-20" in process water at amount of 2-3 volumes of production string (column of pipe-compressor tubes- the CPCT). There is washed zone of perforation and the CPCT. The well is washed with 0.08-0.12 % solution of ML-81B in process mineralised water to a "clear water". Solution is pumped to clean perforation openings - it is 3-5 % solution of Neftenol K of grade "NK-20" in 12.0-24.0 % solution of inhibited hydrochloric acid of volume of 2-6 m3 - through said pipe at an open pipe gate. Further, at a closed pipe gate, at amount of volume of the said tubing, solution for cleaning is pressurised into a reservoir with 0.08-0.12 % solution of ML-81B; it is conditioned under pressure for 4-8 hours, then pressure is dropped, products of reaction at amount of 2-4 volumes of pumped cleaning solution are withdrawn, the well is washed with mineralised water to a "clear water". Water solution is pumped to the well up to the interval of perforation through the said tubing at the open pipe gate. This processing water solution has composition, %: 3-6 of dry acid "DA-TK 4", 1-4 of Neftenol K of grade "NK-20", 0.025-0.05 of corrosion inhibitor "CIU-118". Successively, the gate is closed, treatment solution is pumped into the reservoir at amount of from 1.5 to 2 m3/m of perforated thickness of reservoir with 0.08-0.12 % solution of ML-81B at amount of not less, than volume of the said tubing +1 m3 and not more, than summary volume of treatment solution and volume of the said tubing. Solution is conditioned under pressure for 8-24 hours. Pressure is dropped and products of reaction are withdrawn from the well at amount of 2-4 of volumes of pumped treatment solution and solution of ML-81B. The well is washed with process mineralised water to "clear water".
EFFECT: increased efficiency of pressure well, perforations and bottomhole zone.
3 ex
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR TREATMENT OF BOTTOMHOLE ZONE OF WELL | 2009 |
|
RU2398960C1 |
DEVELOPMENT METHOD OF BOTTOM-HOLE ZONE | 2012 |
|
RU2506421C1 |
METHOD FOR DYNAMIC MATRIX ACID TREATMENT OF CARBONATE FORMATION | 2020 |
|
RU2750806C1 |
METHOD OF REPAIRING WELL | 2015 |
|
RU2584440C1 |
DEVELOPMENT METHOD OF BOTTOM-HOLE ZONE | 2012 |
|
RU2506422C1 |
METHOD OF WELL DEVELOPMENT BY CREATING DEPRESSION ON FORMATION | 2011 |
|
RU2451172C1 |
WELL COMPLETION METHOD | 2018 |
|
RU2695908C1 |
METHOD OF SELECTIVE TREATMENT OF BOTTOM-HOLE FORMATION ZONE | 2018 |
|
RU2700851C1 |
METHOD OF THERMOFOAM-ACID TREATMENT OF NEAR-WELL ZONE OF CARBONATE RESERVOIR | 2016 |
|
RU2638668C1 |
TREATMENT METHOD OF BOTTOMHOLE ZONE | 2012 |
|
RU2520221C1 |
Authors
Dates
2011-04-10—Published
2010-06-07—Filed