WELL COMPLETION METHOD Russian patent published in 2019 - IPC E21B43/114 

Abstract RU 2695908 C1

FIELD: oil and gas industry.

SUBSTANCE: invention relates to oil industry and can be used in completion of wells. At well completion, drilling is performed with drilling of productive formation, lowering of production string, cementing of annulus space, perforation, treatment with acid and swabbing. During perforation lowering into the production string the assembly from the tubing string with piercing action perforator, performing perforation on process water with piercing perforator of production string and cement in annular space in interval of productive formation, after each actuation of perforator through perforator and formed perforation holes caverns in productive formation are washed in process water in amount of 2.5–3.5 m3 per 1 perforation at pressure 15–16 MPa with flow rate of 3.5–4 l/s. During treatment of the bed with acid, stepped acid treatment of the perforation interval is carried out with acid pumping and organization of acid baths under pressure with process water with stepped pressure increase at each stage until well injection capacity is not less than 0.5 l/s at pressure of 3–5 MPa. Swabbing is carried out in three stages with intensive extraction in amount of 0.5 m3 for 20–30 minutes at first and second stages and low-intensity extraction in volume of 0.5 m3 45–60 minutes at the third stage. Process water used is water with density which provides back pressure to the formation, which includes a surfactant in amount of 0.1–0.3 wt% and a neutraliser of hydrogen sulphide of 0.08–0.12 wt%.

EFFECT: technical result is reduced risk of water flooding.

1 cl

Similar patents RU2695908C1

Title Year Author Number
METHOD FOR COMPLETING AND INTENSIFYING INFLOW OF WELL WITH CARBONATE RESERVOIRS 2020
  • Minnullin Rashit Mardanovich
  • Faskhutdinov Ruslan Rustiamovich
RU2750004C1
METHOD FOR PERFORATING A WELL AND PROCESSING A BOTTOM-HOLE CARBONATE FORMATION ZONE 2017
  • Gazizov Ilgam Garifzyanovich
  • Salikhov Ajrat Dufarovich
  • Kurbanov Akhmadali Dzhalilovich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
RU2656255C1
METHOD FOR PERFORATING WELL AND PROCESSING BOTTOM-HOLE CARBONATE FORMATION ZONE 2017
  • Nasybullin Arslan Valerevich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
RU2667239C1
INSULATION METHOD FOR BEHIND-THE-CASING FLOWS IN PRODUCTION WELL 2020
  • Ziiatdinov Radik Ziauziatovich
RU2739181C1
WATER AND GAS INFLUX LIMITING METHOD WITH WELL PRODUCTIVITY RECOVERY 2013
  • Apasov Gajdar Timergaleevich
  • Apasov Timergalej Kabirovich
  • Kuzjaev Ehl'Mir Sattarovich
  • Apasov Renat Timergaleevich
RU2539047C1
METHOD OF PROCESS WELL TREATMENT 2015
  • Saetgaraev Rustem Khalitovich
  • Ismagilov Fanzat Zavdatovich
  • Babichev Igor Nikolaevich
  • Melnikov Andrej Ivanovich
  • Abdullin Fanil Foatovich
RU2600137C1
CARBONATE FORMATION HYDRAULIC FRACTURING METHOD 2013
  • Nasybullin Arslan Valer'Evich
  • Salimov Vjacheslav Gajnanovich
  • Salimov Oleg Vjacheslavovich
RU2509883C1
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL BOREHOLE OF WELL 2019
  • Khusainov Ruslan Fargatovich
  • Ismagilov Fanzat Zavdatovich
  • Tabashnikov Roman Alekseevich
RU2708747C1
PROCEDURE FOR TREATMENT OF BOTTOMHOLE ZONE OF WELL 2009
  • Khisamov Rais Salikhovich
  • Shafigullin Rinat Il'Dusovich
  • Torikova Ljubov' Ivanovna
  • Isakov Vladimir Sergeevich
  • Musaev Gajsa Lemievich
RU2398960C1
CASING ANNULUS PLUGGING METHOD 2005
  • Agamalov Garislav Borisovich
  • Mamontov Valentin Valentinovich
  • Sobolev Sergej Fedorovich
  • Tupysev Mikhail Konstantinovich
RU2286438C1

RU 2 695 908 C1

Authors

Minnullin Rashit Mardanovich

Faskhutdinov Ruslan Rustyamovich

Dates

2019-07-29Published

2018-07-24Filed