FIELD: process engineering.
SUBSTANCE: inventions relates to dispersers to be used in oil industry for preparation of gas-liquid mix, i.e. foam, emulsion or suspension of required dispersion. Proposed device comprises casing, processing element arranged on core moving in said casing, and/or in casing. Various shapes and dimensions of said processing elements may be used Casing may have variable section. It is possible to vary dispersion of prepared mix or solution preparation interval by moving the core, i.e. variation is possible at constant flow rate. On the other hand, to allow constant dispersion of mix or constant rate/time of solution preparation at variable flow rates it is necessary and sufficiently to keep up constant pressure difference in said device by moving said core. If required, proposed device may be cut off without interrupting feed of mixed components.
EFFECT: possibility to vary dispersion and control rate/time of dissolution without varying flow rate.
3 cl, 13 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR WELL KILLING | 2010 |
|
RU2431736C1 |
DEVICE FOR SELECTIVE CLEANING OF PERFORATION CHANNELS AND BOTTOMHOLE FORMATION ZONE OF CONVENTIONALLY UNLIMITED THICKNESS | 2010 |
|
RU2450118C1 |
DEVICE FOR WELL CLEANING | 2009 |
|
RU2408777C1 |
MOMENTARY DISCHARGE MEASURING DEVICE | 2008 |
|
RU2372590C1 |
WELL KILLING METHOD | 2013 |
|
RU2545197C1 |
METHOD OF DIRECTIONAL GENERATION OF STEADY STRUCTURED FINE GAS AND LIQUID MIX IN CONDITIONS OF PORTION SUPPLY OF LIQUID AND GAS | 2014 |
|
RU2553105C1 |
METHOD FOR REMOVING LIQUID FROM WELLS AND BHZ BY HYDROPNEUMATIC SWABBING | 2021 |
|
RU2753721C1 |
DEVICE FOR CLEANING OF BOTTOM HOLE FORMATION ZONE PERFORATION AND UNSEALING ZONE | 2014 |
|
RU2545232C1 |
FLOWMETER | 2017 |
|
RU2643688C1 |
METHOD AND DEVICE FOR TREATMENT OF PERFORATION CHANNELS AND BOTTOMHOLE FORMATION ZONE WITH CONVENTIONALLY INFINITE THICKNESS | 2014 |
|
RU2544937C1 |
Authors
Dates
2011-05-20—Published
2009-11-24—Filed