FIELD: mining.
SUBSTANCE: when the well shaft is being constructed through unstable clay mine rocks, a vertical section is built. The section of initial deviation is drilled with increase in and stabilisation of a zenith angle of less than 60° by means of a navigation telemetric system. Flushing fluid is used with the base represented with clay flushing fluid with density ρ=1250-1400 kg/m3 with addition of modified disperse silica in the quantity of 0.1-0.3 vol. %. Casing string is lowered to the well with entry to upper lime, and casing string annulus is cemented. Productive part is opened by drilling the shaft using polymer-clay solution with density ρ=1112-1200 kg/m3 with increase in the zenith angle required for achieving the horizontal plane in the middle of the project formation.
EFFECT: avoiding cases of severe accidents when developing unstable rocks at high zenith angle.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR CONSTRUCTION OF HORIZONTAL WELL IN DEVONIAN STRATA | 2009 |
|
RU2421586C1 |
METHOD OF HORIZONTAL WELL CONSTRUCTION IN SECTIONS OF UNSTABLE STRATA (VERSIONS) | 2012 |
|
RU2507371C1 |
METHOD FOR WELL CONSTRUCTION | 2012 |
|
RU2494214C1 |
WELL CONSTRUCTION METHOD IN COMPLEX GEOLOGICAL CONDITIONS | 2018 |
|
RU2704089C1 |
HORIZONTAL WELL CONSTRUCTION METHOD | 2013 |
|
RU2532494C1 |
METHOD OF WELL CONSTRUCTION IN COMPLICATED MINING AND GEOLOGICAL CONDITIONS FOR DRILLING AND DEVICE FOR ITS IMPLEMENTATION | 2013 |
|
RU2531409C1 |
METHOD OF DRILLING INCLINED AND HORIZONTAL WELL BORES | 2009 |
|
RU2401378C1 |
METHOD FOR INCOMPETENT MUD SHALE BED PENETRATION DURING DRILLING OPERATION | 2003 |
|
RU2256762C1 |
PROCEDURE FOR WELL CONSTRUCTION | 2010 |
|
RU2411336C1 |
CONSTRUCTION OF OIL PRODUCTION WELL | 2013 |
|
RU2524089C1 |
Authors
Dates
2013-02-10—Published
2012-03-27—Filed