FIELD: construction.
SUBSTANCE: method to erect foundations of new reservoirs in place of dismantled reservoirs includes digging a pit, arrangement of a soil cushion and construction of a foundation of shallow location. The pit of different depth is dug under a dismantled reservoir, besides, it is 1.3-2.6 times less than in the previous undeveloped part. Then the base soil is compacted between areas of dismantled reservoirs location, and the soil cushion is arranged.
EFFECT: increased bearing capacity of the base and evenness of the new foundation subsidence distribution, reduced material intensity.
3 dwg
| Title | Year | Author | Number |
|---|---|---|---|
| CONSTRUCTION METHOD OF RESERVOIR FOUNDATION BASE | 2008 |
|
RU2388870C1 |
| METHOD TO ERECT RESERVOIR FOUNDATION | 2010 |
|
RU2437987C1 |
| METHOD TO PREPARE BASE OF CYLINDRICAL RESERVOIRS ON COMPRESSIBLE SOILS | 2009 |
|
RU2475596C2 |
| METHOD OF CONSOLIDATING SINKING SOIL BY ITS OWN WEIGHT AND WEIGHT OF ERECTED BUILDING | 0 |
|
SU1649036A1 |
| BASE FOR LINEAR GROUP OF RESERVOIRS | 2011 |
|
RU2478756C1 |
| BASE FOR CLOSELY LOCATED RESERVOIRS | 2011 |
|
RU2478755C1 |
| PILED RAFTS OF RESERVOIR FOUNDATION | 2012 |
|
RU2513067C1 |
| METHOD FOR PREPARING FOUNDATION OF BUILDINGS ON WEAK SOILS | 2018 |
|
RU2684558C1 |
| DRILLING METHOD TO ERECT STRIP FOUNDATION IN WATER-BEARING SOILS | 2010 |
|
RU2415228C1 |
| SHALLOW FOUNDATION STRUCTURE | 2015 |
|
RU2605470C2 |
Authors
Dates
2011-06-27—Published
2010-01-18—Filed