FIELD: construction.
SUBSTANCE: construction method of reservoir foundation base involves uniform location of vertical piles in large and small circles. First, a trench is excavated, piles are lowered to the depth equal to where d - circle diametre, n - number of circles of arrangement of piles, N - circle No., starting from the central one and a blanket is made for foundation and bottom of reservoir; at that, distance between circles of pile arrangement is equal, and distance between piles is equal to diametre of the pile itself.
EFFECT: increasing rigidity of the base owing to limiting the earth movement.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
PILED RAFTS OF RESERVOIR FOUNDATION | 2012 |
|
RU2513067C1 |
RESERVOIR FOUNDATION | 2003 |
|
RU2247193C1 |
METHOD TO ERECT FOUNDATIONS OF NEW RESERVOIRS IN PLACE OF DISMANTLED RESERVOIRS | 2010 |
|
RU2422590C1 |
METHOD TO ERECT RESERVOIR FOUNDATION | 2010 |
|
RU2437987C1 |
METHOD OF BUILDING FOUNDATION FOR RESERVOIR | 2002 |
|
RU2209884C1 |
METHOD TO PREPARE BASE OF CYLINDRICAL RESERVOIRS ON COMPRESSIBLE SOILS | 2009 |
|
RU2475596C2 |
METHOD TO ARRANGE BASE OF STRUCTURAL FOUNDATIONS | 2012 |
|
RU2496944C1 |
BASE FOR LINEAR GROUP OF RESERVOIRS | 2011 |
|
RU2478756C1 |
BASE FOR CLOSELY LOCATED RESERVOIRS | 2011 |
|
RU2478755C1 |
RESERVOIR FOUNDATION ON WEAK BASE | 2010 |
|
RU2439248C1 |
Authors
Dates
2010-05-10—Published
2008-12-18—Filed