FIELD: mining.
SUBSTANCE: open or underground development of ore deposits is performed in flow, in automated mode with removal of finished or crude metals immediately from masses of high-grade ore blocks, with separate excavation of temporarily off-grade and low-grade ore, as well as dead rock and their transportation by using namely pneumatic conveying or hydraulic conveying, or conveying equipment.
EFFECT: higher efficiency of development of ore deposits, which consists in improvement of complete use of resources and mined mineral raw material, labour capacity, economy and ecological properties of production when obtaining the finished product immediately during ore development, reducing capital costs and creating the conditions for arrangement of automated mining-and-metallurgical production.
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT METHOD OF ORE DEPOSITS OF NON HIGH-MELTING METALS | 2010 |
|
RU2425976C1 |
DEVELOPMENT METHOD OF ORE DEPOSITS OF HIGH-MELTING METALS | 2011 |
|
RU2483215C1 |
DEVELOPMENT METHOD OF MONOMETALLIC SULPHIDE ORE DEPOSITS | 2010 |
|
RU2434135C1 |
DEVELOPMENT METHOD OF DIAMOND-ORE DEPOSITS | 2013 |
|
RU2537310C1 |
METHOD FOR COMPLEX DEVELOPMENT OF STRUCTURALLY-MORPHOLOGICALLY DIFFICULT DEPOSIT | 2013 |
|
RU2514310C1 |
METHOD TO DEVELOP DEPOSITS OF MINERALS OF HALF-ROCK AND SOIL TYPES | 2011 |
|
RU2478788C1 |
METHOD OF MINING SOLID MINERAL DEPOSITS | 2000 |
|
RU2182664C2 |
METHOD OF DEVELOPMENT OF NON-ROCKY FORMATION AND BEDDING PLANE DEPOSITS WITH MEDIUM AND STEEP PITCH | 2013 |
|
RU2533406C1 |
METHOD FOR DEVELOPMENT OF SOLID MINERALS DEPOSITS | 2008 |
|
RU2375577C1 |
METHOD OF DEVELOPMENT OF SOLID MINERAL DEPOSITS | 2002 |
|
RU2209973C1 |
Authors
Dates
2011-07-27—Published
2009-12-28—Filed