FIELD: oil and gas industry.
SUBSTANCE: according to the method the connection to distant formation zone is established so that its coverage by draining is increased, and complications caused by rock caving after perforation are prevented. Perforation is performed downwards with increased perforation density with cumulative charges of lower power where there is not any nearest water-bearing formation or water-oil contact. After perforation the chlorhydric acid treatment of open hole is performed. At that, increase in formation pressure and preservation of water content on the same level is accepted as result of the performed treatment.
EFFECT: higher well productivity.
1 ex, 3 tbl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
ACID TREATMENT METHOD OF BOTTOMHOLE ZONE OF CLUSTER WELL | 2019 |
|
RU2713027C1 |
METHOD OF ACID TREATMENT OF OIL RESERVOIR | 2014 |
|
RU2551612C1 |
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSITS | 2012 |
|
RU2513895C1 |
WELL COMPLETION METHOD | 2004 |
|
RU2280752C2 |
LARGE-VOLUME ACID TREATMENT METHOD FOR CARBONATE BED | 2013 |
|
RU2533393C1 |
WELL COMPLETION METHOD | 2005 |
|
RU2304697C1 |
METHOD FOR EFFICIENCY IMPROVEMENT IN INJECTION AND INTENSIFICATION OF OIL AND GAS PRODUCTION | 2009 |
|
RU2567877C2 |
WELL COMPLETION METHOD | 2017 |
|
RU2645054C1 |
METHOD FOR PROCESSING BOTTOMHOLE FORMATION ZONE | 2017 |
|
RU2647136C1 |
METHOD FOR PROCESSING THE BOTTOM-HOLE ZONE OF A PRODUCTIVE LAYER SATURATED WITH HYDROCARBONS WITH RESIDUAL HIGHLY MINERALISED PORE WATER | 2020 |
|
RU2757456C1 |
Authors
Dates
2011-08-10—Published
2010-08-26—Filed