PROCEDURE FOR INCREASED PRODUCTION OF METHANE FROM COAL BEARING STRATA BY RAPID OXIDATION (VERSIONS) Russian patent published in 2011 - IPC E21B43/16 

Abstract RU 2427707 C2

FIELD: oil and gas production.

SUBSTANCE: procedure for increased extraction of methane form coal bearing strata consists in following stages: drilling boreholes into coal bed; perforation of bed by means of charge for formation of initial perforation channels; initiation of coal combustion. Also, perforating charge has a standard charging part and a composition capable to form localised temporary oxidising mediums in initial perforation channels. Initiation of coal combustion is performed at presence of oxidising mediums for enlargement of the initial perforation channels. Other procedures consist in: perforation of coal bearing strata by means of standard perforating charge for formation of perforation channels and in treatment of these perforation channels with a composition creating temporary localised oxidising mediums in them including oxidant, and initiation of coal combustion with utilisation of excessive oxidant for enlargement of initial perforation channels.

EFFECT: increased extraction of methane from coal bed.

12 cl, 1 tbl, 10 dwg

Similar patents RU2427707C2

Title Year Author Number
METHOD FOR EFFICIENCY IMPROVEMENT IN INJECTION AND INTENSIFICATION OF OIL AND GAS PRODUCTION 2009
  • Bell Mattkhev Robert George
  • Vesson David S.
  • Klark Natkhan Garret
  • Khardesty Dzhokhn Tkhomas
RU2567877C2
METHOD AND DEVICES TO CREATE TRANSITION PRESSURE CONDITION INSIDE WELL BORE 2005
  • Ratanasirigulchai Vanchai
  • Bermann Lourens A.
  • Martin Ehndrju Dzh.
  • Gudmehn Kennet R.
RU2310067C2
DEVICE AND METHOD OF ENERGY CONTROL OF EXPLOSION IN WELL BORE 2006
  • Li Khaoming
  • Smitman Shantal'
  • Dzhouns Klod D.
  • Lemme Frederik St.
RU2388903C2
METHOD AND FACILITY FOR CONTROL OVER UNSTABLE STATE IN WELL BOREHOLE 2003
  • Dzhonson Ehshli B.
  • Bermann Lourens A.
  • Jang Venbo
  • Dornbos Fokko Kh.K.
  • Uolton Jan S.
RU2352769C2
FACILITY AND METHODS FOR REMOVING FILTER CAKE FROM UNCASED BOREHOLE OF WELL 2005
  • Chang Frehnk F.
  • Bermann Lourens A.
  • Uolton Iehn S.
  • Chan' Kehn Sehn
RU2360100C2
PROCEDURE FOR FIRING PERFORATION HOLES IN UNDERGROUND FORMATION 2007
  • Zazovskij Aleksandr F.
  • Akhmadikin Vadim
  • Jang Venbo
  • Grouv Brenden M.
RU2411353C2
PERFORATOR FOR OIL WELL (VARIANTS) AND METHOD FOR CONCURRENT PERFORATION OF APERTURES IN CASING STRING OF OIL WELL AND IN AN AREA, SURROUNDING OIL WELL (VARIANTS) 2002
  • Burn Brajan
RU2255208C2
CUMULATIVE CHARGE 2010
  • Khuan Khunfa
  • Grouv Brenden M.
  • Nejzl Filip
RU2557281C2
COUPLING ADAPTER, PERFORATING SYSTEM AND METHOD OF WELL PERFORATION 2007
  • Ross Kolbi U.
  • Sampson Timoti U.
  • Majers Uill'Jam D. Dzhr.
RU2447268C2
METHOD AND TOOL STRING FOR WELL TREATMENT TO IMPROVE COMMUNICATION BETWEEN RESERVOIR AND WELL BORE (VARIANTS) 2004
  • Bermann Lourens A.
  • Ehjub Dzhozef A.
  • Uolton Jan
  • Venkitaraman Adinatan
  • Chang Frehnk F.
RU2299976C2

RU 2 427 707 C2

Authors

Olsen Tom

Dates

2011-08-27Published

2007-04-12Filed