PROCEDURE FOR DETECTION OF PRESSURE FLUCTUATIONS IN RESERVOIR, SYSTEM FOR ITS IMPLEMENTATION, PROCEDURE FOR ANALYSIS OF FLUID PRESSURE FLUCTUATIONS INSIDE RESERVOIR Russian patent published in 2011 - IPC E21B47/00 E21B49/10 

Abstract RU 2427710 C2

FIELD: oil and gas production.

SUBSTANCE: downhole tool containing first probe is located in first position and second probe is located in second position removed from first one inside well. Pressure data are received with the second probe at a closed isolation valve connecting the second probe with a straight-through pipeline of the tool. Sampling and fluid analysis are performed in a well by means of the first probe. Presence of the first phase of fluid is detected inside the tool. There are detected pressure fluctuations inside the reservoir by means of the second probe. The second phase of fluid is identified on base of detected pressure fluctuations. The system for implementation of the procedure for detection of pressure fluctuations in a reservoir is equipped with the first probe, the second probe, a module for fluid analysis, with a cable and a controller. The first probe is connected with a case in the first position and is designed for sampling operations. The second probe is connected with the case in the second position removed from the first one and is designed for obtaining data on pressure at a closed isolation valve connecting the second probe with the straight-through pipeline of the tool. The controller connected with the probes controls the sampling operation by means of the first probe for analysis of the first phase of fluid. Also, the controller is designed for control of detection of pressure fluctuation inside the reservoir by means of the second probe and for detection of the second phase of fluid on base of detection of pressure fluctuations.

EFFECT: upgraded accuracy of determination of phase transition in reservoir.

31 cl, 13 dwg

Similar patents RU2427710C2

Title Year Author Number
METHOD AND DEVICES FOR SAMPLING HEAVY OIL FROM UNDERGROUND RESERVOIR 2008
  • Sonne Karsten
  • Khedzhemen Piter S.
  • Gudvin Ehntoni R.Kh.
  • Vaskes Rikardo
RU2464419C2
FACILITY AND PROCEDURE FOR ESTIMATION OF OIL RESERVOIR 2005
  • Gudvin Ehntoni R.Kh.
  • Khsu Kaj
  • Frelz Majkl V.
RU2383734C2
METHOD FOR CHARACTERISATION OF HYDROCARBON RESERVOIRS 2013
RU2613214C2
FORMATION TEST AND SAMPLER WITH CORING DEVICE 2007
  • Chakarov Borislav Dzh.
RU2447283C2
METHODS AND DEVICE FOR ANALYSIS OF WELL PYROBITUMEN GRADIENTS AND THEIR APPLICATION 2009
  • Tszo Jusjan
  • Mallins Oliver K.
  • Gao Tszinlin'
  • Kkharrat Abdel M.
  • Indo Kentaro
  • Djubo Fransua
  • O'Kif Majkl
  • Betankur Soraja S.
  • Dong Chengli
RU2395685C1
METHOD OF PROVIDING OF REPRESENTATIVE SAMPLE SAMPLING OF FLUID (VERSIONS) 2004
  • Betankort Saraja S.
  • Mullins Oliver S.
  • Khammami Akhmed
  • Najsuonder Dzhon A.
  • Khedzhemen Piter S.
  • Ratulovski Dzhon
  • Mukhammad Moin
  • Kennedi Rejmond G.
  • Dun Chehnli
  • Olliero Ehrvan
RU2384703C2
EQUIPMENT AND METHOD OF SAMPLING IN BED 2012
  • Larter Stefen Richard
  • Bennett Barri
  • Snoudon Llojd Ross
RU2564303C1
DEVICE FOR IDENTIFYING MINERALS, AS WELL AS CORRESPONDING SYSTEM AND METHOD 2012
  • Khej Richard Tomas
RU2586348C2
DOWNHOLE TOOL FOR RESERVOIR TESTING 2005
  • Rid Lennoks
  • Khehrrigan Ehdvard
  • Brennan Uil'Jam E. Iii
RU2363846C2
METHOD FOR DETECTION OF RESERVOIR FLUID PROPERTIES 2005
  • Fridman Robert
RU2367981C2

RU 2 427 710 C2

Authors

Mallinz Oliver K.

Kuchuk Fikri

Karnegi Ehndrju

Dates

2011-08-27Published

2006-11-23Filed