FIELD: oil and gas production.
SUBSTANCE: invention consists of measuring device of structure fitted for connection and disconnection to production channel of production tree, of hose functionally connected to structure and of flow metre at least partially placed inside hose.
EFFECT: monitoring flow from multitude of wells independently and at one time.
43 cl, 8 dwg
Title | Year | Author | Number |
---|---|---|---|
OFFSHORE WELL FOR OIL AND GAS RECOVERY WITH ABOVE-WATER PLACEMENT OF WELLHEAD EQUIPMENT | 2014 |
|
RU2566162C1 |
UNDERWATER WELL | 1997 |
|
RU2186933C2 |
ROTARY DEVICE | 1997 |
|
RU2186934C2 |
METHOD FOR OPERATING GAS WELLS AT LATER STAGE OF NATURAL GAS FIELD DEVELOPMENT AND DEVICE FOR ITS IMPLEMENTATION | 2021 |
|
RU2760183C1 |
PIPE STRING SYSTEM FOR SELECTIVE REGULATION OF FLUID FLOWS WITH VARIABLE SPEEDS IN WELLS FORKING FROM ONE COMMON WELLBORE | 2011 |
|
RU2556560C2 |
MARINE MULTIHOLE GAS WELL FOR OPERATION OF OFFSHORE DEPOSITS ARCTIC ZONE WITH SURFACE ARRANGEMENT OF WELLHEAD EQUIPMENT | 2014 |
|
RU2584706C1 |
METHOD OF CONTINUOUS DISCRETE INDICATOR MARK SAMPLING FROM GAS HOLE AND DEVICE TO THIS END | 2007 |
|
RU2354826C2 |
DESIGN OF COASTAL MULTI-HOLE INTELLIGENT GAS WELL FOR DEVELOPMENT OF OFFSHORE DEPOSIT | 2015 |
|
RU2580862C1 |
METHOD OF DEEP GAS WELL EQUIPMENT WITH TUBING STRING COMPOSITION | 2016 |
|
RU2614998C1 |
INSTALLATION NAMED AFTER GARIPOV FOR OIL PRODUCTION WITH DUAL DISPOSAL OF BRINE WATER AND METHOD OF ITS IMPLEMENTATION (VERSIONS) | 2012 |
|
RU2534688C2 |
Authors
Dates
2011-09-10—Published
2008-04-10—Filed