FIELD: gas and oil production.
SUBSTANCE: procedure for perforating operations in well consists in transportation of cumulative perforator on cable into required interval of well, in its orientation, in successive actuation of cumulative charges of perforator and in formation of channels oriented in required position for fluid inflow in casing and rock. A gravitational orientator with set off gravity centre is connected to the perforator before transportation into a required interval to facilitate a required position in the well. Position of the gravitation orientator relative to the perforator and charges is fixed. Orientation of the perforator in the well before its actuation is performed by means of the gravitational orientator and a cable.
EFFECT: raised efficiency of facilitation of required position of perforator in well, reduced time and expenditures for its orientation.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PERFORMING PERFORATING OPERATIONS IN OIL AND GAS WELLS AND FACILITY FOR IMPLEMENTATION OF THIS METHOD | 2008 |
|
RU2370639C1 |
JET PERFORATOR FOR PERFORMANCE OF PERFORATING OPERATIONS IN OIL AND GAS WELLS | 2010 |
|
RU2447267C2 |
METHOD FOR DEVELOPMENT OF PRODUCTIVE FORMATION OF WELL WITH CUMULATIVE CHARGES AND DEVICE FOR IMPLEMENTATION THEREOF (EMBODIMENTS) | 2019 |
|
RU2732554C2 |
SINGLE-USE SHAPED-CHARGE PERFORATOR | 2006 |
|
RU2307235C1 |
CHARGING UNIT FOR SINGLE-USE SHAPED-CHARGE PERFORATOR | 2006 |
|
RU2307236C1 |
ONE-USE SHAPED-CHARGE PERFORATOR | 2006 |
|
RU2318990C1 |
SINGLE USE SHAPED-CHARGE GUN | 2006 |
|
RU2313658C1 |
METHOD OF OPENING PRODUCTIVE WELL FORMATION BY SHAPED CHARGES AND DEVICE FOR ITS IMPLEMENTATION | 2016 |
|
RU2647547C1 |
SIMULATED COMPLETION METHOD FOR GAS WELL PRODUCTIVE FORMATIONS | 2013 |
|
RU2517250C1 |
CUMULATIVE PERFORATOR (VERSIONS) | 2015 |
|
RU2603792C1 |
Authors
Dates
2011-12-20—Published
2010-01-11—Filed