FIELD: mining.
SUBSTANCE: method involves arrangement of reinforcing elements made in the form of mesh in filling chamber at the boundary with rock ore to be developed. Reinforcing elements are arranged at distance of 0.05b from each other, where b - chamber width. After installation of reinforcing elements the worked out space is filled with filling mass of various strength. Lower, central and upper part of chamber is filled at 1/10 of its height with curing mixture, and space between them with hydraulic fluid from fine material without binding agent.
EFFECT: reducing the costs; improving manufacturing capabilities.
1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR STRENGTHENING FILLING MASS | 1991 |
|
RU2047780C1 |
EXCAVATION METHOD OF HEAVY-PITCHING THICK AND AVERAGE THICK ORE DEPOSITS WITH COMPLICATED STRUCTURE | 2006 |
|
RU2327038C1 |
METHOD OF REINFORCING FILLING MASS | 2014 |
|
RU2555996C1 |
METHOD OF CREATING WATER-RESISTANT FILLING MASS | 2016 |
|
RU2642750C1 |
METHOD OF SHRINKAGE RELATIVE DEFORMATION MINIMIZATION OF HARDENING FILLING MASS | 2015 |
|
RU2606738C1 |
METHOD OF WORKING STEEPLY-DIPPING DEPOSITS | 0 |
|
SU1774014A1 |
STRENGTHENING METHOD OF HARDENING FILLING MASS | 2015 |
|
RU2606729C1 |
DEVICE FOR RETARDING STOW LUMP VELOCITY | 0 |
|
SU1710781A1 |
METHOD OF LAYER MINING OF KIMBERLITE PIPE BY RAISING AND FILLING | 2001 |
|
RU2186981C1 |
METHOD OF MINING MINERAL DEPOSITS | 0 |
|
SU1710739A1 |
Authors
Dates
2011-12-20—Published
2010-04-12—Filed