FIELD: mining engineering.
SUBSTANCE: working method includes drifting of preparatory breakoffs, slicing of stope inclined strips, inclined according to sloping angle of ore body, beginning with hanging layer directed to bottom wall, ore breaking with explosive holes. Breakage, transportation and formation releasing from rocky bands in ore body are carried out separately through the flanking debris chute. Previous slice after corresponding preparation is filled with weak solid stowing, which provides hardiness of its walls, at that interblock pillars are eliminated with leaving of free technological space between ore mining face roof and horizontal surface of previous slice filling mass. At first one excavates low layer of the block with entry ways at whole its length, fills worked entry ways with hard solidifying mixture in particular order with preliminary armature setting up, so that after the complete excavation of the layer in-situ concrete slab is appeared. It performs the functions of ceiling while debugging of underlying block reservoir.
EFFECT: effectiveness improvement of ore excavation and safety of stopes working.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXTRACTION OF STEEP-FALLING DEPOSITS OF WEAK ORES | 2003 |
|
RU2248448C1 |
PROCESS OF DEVELOPMENT OF COMPLEX-STRUCTURED DEPOSITS | 2002 |
|
RU2223401C2 |
METHOD FOR DEVELOPING THIN AND LOW-POWERED STEEL-FALLING ORE BODIES | 2021 |
|
RU2755287C1 |
DEVELOPMENT METHOD OF THICK STEEPLY DIPPING ORE BODIES | 2012 |
|
RU2502872C1 |
METHOD OF MINING THICK ORE DEPOSITS | 0 |
|
SU1461942A1 |
UNDERGROUND DEVELOPMENT METHOD OF SERIES OF THIN STEEP DEPOSITS | 2009 |
|
RU2425218C1 |
METHOD TO MINE THICK STEEP DEPOSITS OF UNSTABLE ORE | 2016 |
|
RU2648371C1 |
METHOD FOR OPENING STEEP THIN ORE DEPOSITS | 1991 |
|
RU2094612C1 |
METHOD OF SOLID WORKING OF ORE BODIES | 0 |
|
SU1035226A1 |
METHOD OF UNDERGROUND MINING OF MASSIVE STEEP ORE DEPOSITS | 2009 |
|
RU2411360C1 |
Authors
Dates
2008-06-20—Published
2006-10-20—Filed