FIELD: construction.
SUBSTANCE: ground plastering level consists of a section of a pipe with rectangular section. Near both ends the straightener is equipped with pressing spring-loaded screws and forcing screws, one piece of every type, at both ends of the straightener.
EFFECT: reduced labour intensiveness of grounds installation, higher quality of grounds.
3 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICES, METHODS FOR THEIR FASTENING AND LEVELLING OF SURFACES | 2014 |
|
RU2603647C2 |
FIXATOR OF ANGULAR PLANK | 2012 |
|
RU2517095C2 |
STRIP FIXATOR | 2012 |
|
RU2516306C2 |
METHOD FOR STRING SCREED MAKING OF MORTAR | 2005 |
|
RU2291262C1 |
METHOD TO INSTALL METAL SCREED STRIP AND ACCESSORY FOR ITS FIXATION ON SPECIFIED LEVEL RELATIVE TO SURFACE (WALL, CEILING, FLOOR) | 2012 |
|
RU2540730C2 |
GUIDE STRING | 2006 |
|
RU2308579C1 |
STRIP CLAMP | 2023 |
|
RU2813689C1 |
TOOL FOR PLASTERING OF JAMBS | 2012 |
|
RU2516097C2 |
DEVICE AND METHOD FOR PLASTERING OF WALLS | 2009 |
|
RU2387769C1 |
METHOD AND DEVICE FOR BUILDING WALL PLASTERING | 2004 |
|
RU2268344C1 |
Authors
Dates
2012-01-10—Published
2010-02-08—Filed